SPECIFICATIONS
AC Operational
Voltage Range
Test Point:
AC Single
1
or 3-Phase
3
: 0 - 1000V
@ 50/60/400Hz
Voltage Indicator:
AC Single
1
or 3-Phase
3
: 20-1000V, 50/60/400 Hz
DC Voltage or
Stored Energy
Range
Test Point:
0 - 1000V
any (2) wires
Voltage Indicator:
20 - 1000V
, (Voltages Line-to-Line or Line-to-Ground)
Maximum Voltage 1000V
3
or 1000V
Maximum Power
Consumption
Test Point:
3 Watts @ 1000V (approx.) with fault load of any (2) corresponding test points
shorted indefinitely
Voltage Indicator:
2.1
Watts
Temperatures
Operate: -20ºC to +55ºC Storage: -45ºC to +85ºC
Failure Current
Maximum single component failure fault current at 1000V
or 1000V
Test Point:
3.2mA
with a momentary short between any (2) test points
Voltage Indicator:
3.7mA with any (1) line input series power resistor shorted
Internal
Resistance
Test Point:
(2) 82K 3W 5% Tolerance series resistors encapsulated between each input wire
and respective test point (164KΩ 6W equivalent between any two test points)
Output Accuracy
-3.2% of applied voltage with 10M Ω input impedance voltmeter connected to any (2) test
points
Terminations
(4) Wires, 8 ft, 14 AWG, 90°C @ 1000V, UL-1452, PVC Insulated w/ Nylon Jacket
Voltage Category
Ratings
CAT III @ 1000V
Max, Pollution Degree 3, CAT IV @ 600 V
Max, pollution Degree 3
Housing
UL Approved material, totally encapsulated including LEDs for environmental protection
Indicators:
(6) Red {L1, L2, L3} and (2) Yellow {GND}, Super Bright LEDs
Equipment needed:
Digital Volt Meter with 600V AC or DC rated input minimum, 10M ohm input impedance and CAT III & IV. A pair of insulated test probes with .080" DIA. points.
Directions:
Before and after each test, determine the volt meter is operating satisfactorily through verification of known AC & DC voltage sources. With the meter
switched to ACV and test leads in ACV meter jacks, a qualified person can insert probe points into any two of the (4) terminal posts {L1, L2, L3, GND}.
1. To validate normal powered conditions, AC voltage is observed for all six (6) post pair combination circuits {L1-L2, L1-L3, L2-L3, L1-GND, L2-GND, L3-GND}.
2. To check for zero electrical energy during shut off, verify sources of feedback or stored energy are first neutralized. With the meter and leads setup for ACV
measurement, verify the (6) post pair combination circuits above are de-energized. Change voltmeter and test leads for DCV measurement. Again verify the (6) post
pair combination circuits are also de-energized for DCV (stored energy).
With power removed, free dust and particles from front label and jack sockets with compressed air. Maintain a clean label by gently wiping with a clean damp cloth
while power is removed. Cleaning while powered is not recommended.
OPERATING INSTRUCTIONS
MAINTENANCE:
BEFORE OPENING A PANEL, TURN POWER OFF! SAFETY PROCEDURES STILL APPLY! Before working on an
electrical conductor, verify zero electrical energy with proper voltage testing instrument and the proper procedure as
per NFPA 70E 120.1(5), 120.2 (F)(2)(f)(1-6), OSHA 1910.333(b)(2)(iv)(B)."
AVANT D'OUVRIR UN PANNEAU ÉLECTRIQUE, COUPER L'ALIMENTATION! LES PROCÉDURES DE SÉCURITÉ S'APPLIQUENT
TOUJOURS! Avant d'effectuer des travaux sur un conducteur électrique, vérifier que le courant est coupé à l'aide d'un instrument de mesure de
tension approprié en suivant la procédure adéquate, selon les normes de la NFPA (National Fire Protection Association) 70E 120.1(5), 120.2
(F)(2)(f)(1-6), de l'OSHA (Occupational Safety and Health Administration) 1910.333(b)(2)(iv)(B).
THREE PHASE DELTA, 3W + GND
TYPICAL CONFIGURATION
WIRE IDENTIFICATION
NOTE: (4) Test point jacks accept .080” DIA. probe points.
L1
L2
L3
WIRE IDENTIFICATION
Type 4, 4X,
12, 13,
IP66, IP69
Note:
All above ratings are LINE-TO-LINE or LINE-TO-GND
MEASURING EQ.
E311256
ChekVolt
®
is a combination device used to verify the voltage presence using visual
indication and absence through a metered test.
Direct Current
Alternating Current
Single Phase or 3-Phase
Caution
Caution, possibility of
electrical shock
Summary of Contents for PESDs CHEKVOLT R-3MT-VI
Page 10: ... Figure 3 ...
Page 11: ... Fig 3 Fig 4 Figure 4 Figure 5 ...
Page 12: ...SS R3MTVI IG EN 2211 ...