background image

71

Open both channel locks to resume unrestricted quilting. 

To move the machine across the frame and create a straight horizontal line, close only the 

channel lock on the machine.

6

5

To move the machine back and forth on the bottom carriage and create a straight vertical line, 

close only the bottom carriage channel lock.

4

Using Your Frame

Using the Channel Locks (Continued)

Summary of Contents for Continuum II

Page 1: ...Copyright September 18 2020 Grace Company Reproduction Prohibited Version 1 0 Just purchased your frame Save time setting it up by following the instructions in this manual 12 Foot Frame Assembly Use ...

Page 2: ... 29 Step 10 Installing the Bungee Clamps 30 Step 11 Adjusting the Rails 31 Step 12 Installing the Velcro Tape 33 Step 13 Installing Leader Cloth 36 Upgrade Existing Frame 38 Step 1 Rail Assembly 39 Step 2 Track Assembly 42 Step 3 Extending the Table 47 Step 4 Installing the Tracks 51 Step 5 Leveling the Frame 53 Step 6 Installing the Rails 55 Step 7 Adjusting the Rails 57 Step 8 Installing the Vel...

Page 3: ... 09 14639 See page 7 42 12 ft Plastic Track x4 CII 05 10561 See page 12 42 2 ft Rail Sections x3 CII 04 11397 See page 23 39 12 ft Leader Cloth Set CII 09 14777 See page 33 59 Rail Coupler x3 CNT 08 11865 See page 23 39 HDW 03 10951 See page 7 47 SBHCS Screw M8 x 16 mm x16 Set Screw M6 x 6 mm x8 HDW 03 10037 See page 12 42 4 mm T Handle Allen Wrench 4 mm 1 4 1 7 Allen Wrench 5 mm Allen Wrench 3 mm...

Page 4: ...ame has not yet been assembled For steps on extending a frame that has already been set up see Upgrade Existing Frame on page 38 Tip For additional help scan the QR code below with the camera on your smart phone to visit our online support videos https www graceframe com en resources support videos ...

Page 5: ...M8 x 55 mm SBHCS height screws washer and nut with the 10 mm open end wrench and 5 mm Allen wrench Nut x2 2 From Base Frame From Base Frame Height Screw x2 Washer x2 Note Middle legs have only one nut washer and M8 x 55 mm SBHCS height screw On all legs Loosen do not remove the set screws toward the base of each leg with the 4 mm Allen wrench 1 Set Screws Note Middle legs have only one set screw 4...

Page 6: ...d nut 3 Important Set all the legs to the same height hole On all legs Re tighten the set screws with the 4 mm Allen wrench The middle leg has only one set screw 4 Note Final height may vary slightly after adjusting the leveling feet see page 21 Set Screws Setting the Frame Height Continued Extended Frame Assembly ...

Page 7: ...Wrench 5 mm SBHCS Screw M8 x 16 mm x40 Table Section x2 Corner Brace x4 Middle Leg Brace x4 Extended Frame Assembly Left Leg Middle Leg x2 4 mm T Handle Allen Wrench 4 mm From Base Frame From Base Frame Instructions Attach the table tops to the frame legs by taking the following steps From Base Frame Extension Box M6 x 8 mm Connector Bolt Track supports Table Section 2ft Extension Box From Base Fr...

Page 8: ...ews and the 5 mm Allen wrench to attach the left table section to one of the the middle legs M8 x 16 mm SBHCS x2 Use two M8 x 16 mm SBHCS screws to attach the left frame leg to the underside of one of the long table sections Tighten with the 5 mm Allen wrench M8 x 16 mm SBHCS x2 Left Frame Leg Long Table Section Middle Leg M8 x 16 mm SBHCS x4 Corner Brace Note Keep table and leg as square as possi...

Page 9: ...ith the 5 mm Allen wrench M8 x 16 mm SBHCS x2 Table Section Right Frame Leg Carefully lift the table to a standing position 5 6 Building the Frame Table Continued Extended Frame Assembly 7 Use two M8 x 16 mm SBHCS screws and the 5 mm Allen wrench to attach the right table section to the free middle leg M8 x 16 mm SBHCS x2 ...

Page 10: ...S screws M8 x 16 mm SBHCS x4 Corner Brace Note Keep table and leg as square as possible while attaching brace 8 Line up the two table sections so there is about 2 feet of space between them 8 Carefully lift the second half of the frame into a standing position 2 Feet Building the Frame Table Continued Extended Frame Assembly ...

Page 11: ...y Install a middle brace onto the front and back of both middle legs with six M8 x 16 mm SBHCS screws each and the 5 mm Allen wrench Corner Brace x2 M8 x 16 mm SBHCS x8 10 9 Attach the 2ft table section to the middle legs using four M8 x 16 mm SBHCS screws and the 5 mm Allen wrench Middle Brace x4 M8 x 16 mm SBHCS Building the Frame Table Continued ...

Page 12: ... Short Track Supports x2 Removed from table sections in Step 2 Connector Bolts x20 Removed from table sections in Step 2 Set Screw M6 x 6 mm x16 Track Support Connector x4 12 Foot Plastic Track x4 Allen Wrench 3 mm Extended Frame Assembly 4 mm T Handle Allen Wrench 4 mm Base Frame Extension Box Extension Box Base Frame Extension Box Screw two M6 x 6 mm set screws into the track support with the 3 ...

Page 13: ...he track support firmly to the connector 4 Installing the Tracks Continued Extended Frame Assembly Now slide a track connector into the free end of the short track support and use two M6 x 6 mm set screws to hold it in place 5 Track Connector Short Track Support M6 x 6 mm Set Screws x2 M6 x 6 mm Set Screws x2 Track Connector ...

Page 14: ...t to the assembly using the track connector and two M6 x 6 mm set screws 6 M6 x 6 mm Set Screws x2 Long Track Support 8 Loosely connect the track supports to the frame with the 4 mm Allen wrench and the twenty M6 x 10 mm connector bolts removed in Step 2 Building the Frame Table on page 7 Track Support x2 Connector Bolts M6 x 10 mm x20 Installing the Tracks Continued ...

Page 15: ...me 8 Line up the front track support as close to the edge of the frame as possible and tighten the connector bolts 7 Front Track Support Slowly slide the carriage from one side of the frame to the other Tighten each of the connector bolts in the back as the bottom carriage passes over them 9 Bottom Carriage ...

Page 16: ...e Assembly Install the ratcheting front rail arm and take up rail arm on the right side of the frame using four M8 x 55 mm SBHCS screws 2 Front Rail Arm Non Ratcheting Front Rail Arm Ratcheting Take Up Rail Arm Non Ratcheting Take Up Rail Arm Ratcheting Base Frame Base Frame Base Frame Base Frame Front Rail Arm non ratcheting Take up Rail Arm non ratcheting Take up Rail Arm ratcheting Front Rail A...

Page 17: ... carriage before placing the bottom carriage onto the frame Channel locks assist with stitching straight lines Note Instructions for using the channel locks can be found on page 70 Find the front of the bottom carriage The bolts at the front of the carriage have taller heads 1 Taller Bolts Shorter Bolts Locate the right rear bottom carriage wheels 2 Base Frame Base Frame Base Frame 4 mm T Handle A...

Page 18: ...riage onto the frame so the wheels slide over the frame track The channel lock should be positioned on the rear track 5 Installing the Bottom Carriage Continued Extended Frame Assembly M6 x 20 mm SBHCS Channel Lock Washer STOP HERE if you are using a top plate and home sewing machine Please follow the instructions in your top plate manual When finished skip to Step 7 Leveling the Frame on page 21 ...

Page 19: ...ide of your quilting machine or top carriage with the 4 mm Allen wrench 1 STOP HERE Follow the instructions in your machine manual to fully assemble the machine Continue with frame instructions only after machine is completed 3 Place the washer channel lock and machine wheel onto the M6 x 20 mm SBHCS screw 2 Base Frame Base Frame Base Frame If using a top carriage and home sewing machine please fo...

Page 20: ...20 With the channel lock in the open position carefully place machine onto the bottom carriage if not already done 5 Extended Frame Assembly Installing the Quilting Machine Continued ...

Page 21: ...achine doesn t drift or pull to one side when stitching Open End Wrench 14 mm 17 mm Base Frame Move the machine and bottom carriage to one corner of the frame and release If the machine rolls away from the corner use the 17 mm open end wrench to adjust the leveling foot at the bottom of the leg 1 Leveling Foot 1 4 1 7 ...

Page 22: ... two corners 3 Extended Frame Assembly Leveling the Frame Continued Leveling Foot Adjustment Loosen the top nut on the leveling foot with the 17 mm open end wrench a Turn the bottom nut with the 14 mm open end wrench until the desired height is set b Tighten the top nut until it is firm against the frame leg with the 17 mm open end wrench c ...

Page 23: ... of the non ratchet rail sections Line up the screws on the coupler with the holes on the rail 1 Ratchet Rail Section x2 Non ratchet Rail Section x3 Rail Coupler x6 T Handle Allen Wrench 4 mm 4 mm Base Frame Base Frame Extension Box Base Frame Rail Screw Holes Non ratchet Rail Section Rail Coupler Handwheel Rail Section Base Frame 2 ft Rail Sections x3 Extension Box ...

Page 24: ...rmly against the inside of the rail 4 Slide one of the 2 ft rail sections onto the other side of the rail coupler Use the 4 mm Allen wrench to loosen turn counter clockwise the coupler screws inside the rail until they press firmly against the rail 2 2 ft Rail Section Installing the Rails Continued Extended Frame Assembly ...

Page 25: ...de of the rail coupler 7 Now insert a second coupler into the 2 ft rail section 5 Ratchet Rail Section Extended Frame Assembly Installing the Rails Continued Rail Coupler 6 Once again loosen the screws with the 4 mm Allen wrench until the rail and coupler are snug ...

Page 26: ... Line the coupler screws with the holes in the rail and loosen them with the 4 mm Allen wrench until they press firmly against the inside of the rail 8 9 Insert the ratchet section end of one of the rails into the front rail arm ratcheting side 10 Front Rail Arm Ratcheting Ratchet Section Installing the Rails Continued Extended Frame Assembly ...

Page 27: ...ail arm non ratcheting side 11 Non ratchet Rail Front Rail Arm Non ratcheting Extended Frame Assembly Installing the Rails Continued Insert the handwheel rail through the throat of the machine 13 Repeat steps 10 11 for the bottom rail 12 Handwheel Rail ...

Page 28: ...nded Frame Assembly Place the ratcheting side of the rail into the ratcheting take up rail arm and then press the non ratcheting side into the non ratcheting take up rail arm 14 Installing the Rails Continued ...

Page 29: ...ndwheel shoulder bolt and 6 mm Allen wrench to attach the handwheel knob to the handwheel Handwheel Handwheel Knob Handwheel Shoulder Bolt Base Frame Base Frame Base Frame Base Frame Shoulder Bolt M8 x 55 mm SBHCS Screw the handwheel coupler handwheel washer and three armed handwheel knob to the take up rail Three Armed Handwheel Knob Handwheel Coupler M10 Washer Base Frame Base Frame Base Frame H...

Page 30: ...e quilt up and provide additional tension to the quilt surface Take the following steps Step 10 Installing the Bungee Clamps Bungee Clamp x4 Base Frame 1 2 Note Your bungee clamps may have come with bungee stops These will not be used Press down the bungee stop in the front rail arm and thread the bungee cable through Release to tighten 3 Bungee Clamp x4 Bungee Stop x4 ...

Page 31: ... to configure your rails For the standard setup please take the following steps If the throat of your machine is greater than 15 you will need to extend your front rail Use the 4 mm Allen wrench to loosen the set screws on both the front rail arms 1 2 Extend the arm out to the first notch for machines with a throat of up to 19 in length Extend to the second notch for machines with up to a 21 throa...

Page 32: ...eight turn the knobs on the necks of both front rail arms 4 Press in the levers to raise or lower the front rail Set the top of the rail so it is level with the machine s needle plate When the height is set re tighten the height knobs 5 Lever Set the take up rail so there is just enough space to slide a finger between it and the machine Re tighten the knobs 7 Lever Lever ...

Page 33: ... frame The leader cloths help align the quilt and maximize the area of the quilt surface that the machine will be able to reach Fold the Velcro tape found in the leader cloth set in half to find and mark the center 3 Extended Frame Assembly Velcro Tape To help keep the rails in place twist each rail ratchet knob to activate the one way ratchet Rail Ratchet Knob Velcro Tape x3 found in leader cloth...

Page 34: ...tape straight and attach it to the end of the rail Extended Frame Assembly Installing the Velcro Tape Continued 4 5 Note Image showing base setup Step is the same for the extended frame Note Image showing base setup Step is the same for the extended frame On all three rails Lay a tape measure flat across the rail aligning it with the holes on the top Find and mark the center point 5 Measuring Tape...

Page 35: ...de of the rail Repeat steps 3 7 for the other two rails Extended Frame Assembly Installing the Velcro Tape Continued 7 8 Note Image showing base setup Step is the same for the extended frame Note Image showing base setup Step is the same for the extended frame Note Image showing base setup Step is the same for the extended frame ...

Page 36: ... quit to the frame while maximizing the quilt surface that the machine can reach Place the center of the narrowest leader cloth onto the Velcro tape in the center of the take up rail right side facing away from the frame 3 Leader Cloth Set Extended Frame Assembly Marker not included Tape Measure not included Narrowest Leader Cloth right side to the rear Narrowest Leader Cloth Take up Rail Note Ima...

Page 37: ... cloth over the front of the rail right side facing the front 6 Medium Width Leader Cloth right side to the rear Widest Leader Cloth right side to the front Backing Rail Top Rail Installing the Leader Cloth Continued Extended Frame Assembly Note Image showing base setup Step is the same for the extended frame Note Image showing base setup Step is the same for the extended frame Note Image showing ...

Page 38: ...ories This section describes the most efficient steps for installing the two foot extension If your base frame has not already been set up go to the Extended Frame Assembly on page 4 Tip For additional help scan the QR code below with the camera on your smart phone to visit our online support videos https www graceframe com en resources support videos ...

Page 39: ...install the 2 foot extension Please take the following steps Step 1 Rail Assembly Remove fabric and all three leader cloths from the frame 1 T Handle Allen Wrench 4 mm 4 mm Leader Cloths x3 Peel the Velcro tape off of each rail 2 Velcro Tape x3 Upgrade Existing Frame 2 ft Rail Sections x3 Rail Coupler x3 ...

Page 40: ...h a 4 mm Allen wrench to separate the rail sections from the rail coupler 4 Non Ratcheting Rail Section x3 Rail coupler x3 Non ratchet Rail Section Upgrade Existing Frame Handwheel Coupler Washer 3 Armed Handwheel Knob Note Unscrew the 3 Armed handwheel knob to remove the take up rail Rail Assembly Continued ...

Page 41: ...wrench 5 Install the remaining rail couplers into the other end of the two foot section using the 4 mm Allen wrench 6 Install the non ratcheting rail sections onto the couplers with the 4 mm Allen wrench 7 Upgrade Existing Frame 2 Ft Rail Section x3 Rail Coupler x3 Non Ratcheting Rail Section x3 Rail Assembly Continued ...

Page 42: ... install the 2 foot extension Please take the following steps Step 2 Track Assembly Remove the machine and bottom carriage from the frame 1 T Handle Allen Wrench 4 mm 4 mm Allen Wrench 3 mm Upgrade Existing Frame Table Section 2ft Plastic Track 12 ft x4 Track Support Connector x2 Set Screw M6 x 6 mm x8 ...

Page 43: ...to remove the two M6 x 6 mm set screws from one side of the support 4 Set Screw M6 x 6 mm x2 3 Track Support Plastic Track x2 2 Use a 4 mm Allen wrench to remove the connector bolts and track supports from the frame Track Support x2 Connector Bolts x16 Upgrade Existing Frame Track Assembly Continued ...

Page 44: ...k supports from 2 foot table section 6 Track Support x2 Connector Bolts x4 2 ft Table Section On both long track supports with the track coupler Install the two foot track support onto the rail coupler using the two M6 x 6 mm set screws removed previously 7 Set Screw M6 x 6 mm x2 2 Foot Track Support Rail Coupler Track Assembly Continued ...

Page 45: ...ing Frame 8 Set Screw M6 x 6 mm x2 Track Connector On both track supports Slide a long track support into the free end of the track connector 10 On both track supports Use two M6 x 6 mm set screws and the 3 mm Allen wrench to firmly attach a long track support Set Screw M6 x 6 mm x2 Long Track Support 9 Long Track Support Track Assembly Continued ...

Page 46: ...46 On both track supports Thread each of the 12 foot plastic tracks into the track supports 11 Track Support 12 ft Plastic Track x2 Upgrade Existing Frame Track Assembly Continued ...

Page 47: ...tension to the base frame Step 3 Extending the Table Remove the six M8 x 16 mm SBHCS holding the right side of the frame to the middle braces 1 1 4 7 Allen Wrench 5 mm SBHCS Screw M8 x 16 mm x20 Table Section 2ft M8 x 16 mm SBHCS 6 Upgrade Existing Frame Middle Leg Middle Leg Brace x2 ...

Page 48: ...he middle leg 2 Use two M8 x 16 mm SBHCS and the 5 mm Allen wrench to attach the second middle leg to the table frame 3 Position the middle legs so they are about two feet apart 4 M8 x 16 mm SBHCS x2 Upgrade Existing Frame 2 Feet Extending the Table Continued ...

Page 49: ...ction to the legs with four M8 x 16 mm SBHCS screws and the 5 mm Allen wrench 6 Upgrade Existing Frame M8 x 16 mm SBHCS x4 Place the 2 ft table section onto the middle legs 5 2 ft Table Section Extending the Table Continued ...

Page 50: ...the middle braces in step 3 1 7 M8 x 16 mm SBHCS x6 Install the remaining middle leg braces onto the frame with twelve M8 x 16 mm SBHCS screws and the 5 mm Allen wrench 8 Upgrade Existing Frame M8 x 16 mm SBHCS x12 Middle Leg Brace x2 Extending the Table Continued ...

Page 51: ...6 x 10 mm x20 Carefully place the bottom carriage onto the frame 3 Line up the front track support as close to the edge of the frame as possible and tighten the 10 front connector bolts 2 Front Track Support Bottom Carriage Parts Tools Needed Instructions Take the following steps to install and align the frame tracks Step 4 Installing the Tracks T Handle Allen Wrench 4 mm 4 mm Upgrade Existing Fra...

Page 52: ...e the carriage from one side of the frame to the other Tighten each of the ten rear connector bolts as the bottom carriage passes over them 4 Upgrade Existing Frame Connector Bolts x10 Installing the Tracks Continued ...

Page 53: ...pull to one side when stitching Open End Wrench 14 mm 17 mm Base Frame Move the machine and bottom carriage to one corner of the frame and release If the machine rolls away from the corner use the 17 mm open end wrench to adjust the leveling foot at the bottom of the leg 1 Leveling Foot 1 4 1 7 Upgrade Existing Frame ...

Page 54: ...r two corners 3 Leveling the Frame Continued Leveling Foot Adjustment Loosen the top nut on the leveling foot with the 17 mm open end wrench a Turn the bottom nut with the 14 mm open end wrench until the desired height is set b Tighten the top nut until it is firm against the frame leg with the 17 mm open end wrench c Upgrade Existing Frame ...

Page 55: ...Front Rail Arm Non ratcheting Repeat steps 1 2 for the bottom rail 3 Step 6 Installing the Rails Instructions Please take the following steps to install the frame rails Upgrade Existing Frame Insert the ratchet section end of one of the rails into the front rail arm ratcheting side 1 Front Rail Arm Ratcheting Ratchet Section ...

Page 56: ...n ratcheting take up rail arm 5 Installing the Rails Continued Screw the handwheel coupler handwheel washer and three armed handwheel knob to the take up rail Handwheel Coupler Washer Three armed Handwheel Knob Upgrade Existing Frame 6 Insert the take up rail handwheel side first through the throat of the machine 4 Take up Rail ...

Page 57: ...andard setup please take the following steps If the throat of your machine is greater than 15 you will need to extend your front rail Use the 4 mm Allen wrench to loosen the set screws on both the front rail arms 1 2 Extend the arm out to the first notch for machines with a throat of up to 19 in length Extend to the second notch for machines with up to a 21 throat length Re tighten the set screws ...

Page 58: ...the necks of both front rail arms 4 Press in the levers to raise or lower the front rail Set the top of the rail so it is level with the machine s needle plate When the height is set re tighten the height knobs 5 Lever Set the take up rail so there is just enough space to slide a finger between it and the machine Re tighten the knobs 7 Lever Lever Upgrade Existing Frame ...

Page 59: ...ttach the leader cloth to your frame The leader cloths help align the quilt and maximize the are of the quilt surface that the machine will be able to reach Fold the Velcro tape found in the leader cloth set in half to find and mark the center 3 Velcro Tape x3 found in leader cloth set Velcro Tape Marker not included To help keep the rails in place twist each rail ratchet knob to activate the one ...

Page 60: ... on to rail to keep the tape straight and attach it to the end of the rail Installing the Velcro Tape Continued 4 5 Note Image showing base setup Step is the same for the extended frame Note Image showing base setup Step is the same for the extended frame On all three rails Lay a tape measure flat across the rail aligning it with the holes on the top Find and mark the center point 5 Measuring Tape...

Page 61: ...de of the rail Repeat steps 3 7 for the other two rails Installing the Velcro Tape Continued 7 8 Note Image showing base setup Step is the same for the extended frame Note Image showing base setup Step is the same for the extended frame Note Image showing base setup Step is the same for the extended frame Upgrade Existing Frame ...

Page 62: ...he quit to the frame while maximizing the quilt surface that the machine can reach Place the center of the narrowest leader cloth onto the Velcro tape in the center of the take up rail right side facing away from the frame 3 Leader Cloths Marker not included Tape Measure not included Narrowest Leader Cloth right side to the rear Narrowest Leader Cloth Take up Rail Note Image showing base setup Ste...

Page 63: ... cloth over the front of the rail right side facing the front 6 Medium Width Leader Cloth right side to the rear Widest Leader Cloth right side to the front Backing Rail Top Rail Installing the Leader Cloth Continued Note Image showing base setup Step is the same for the extended frame Note Image showing base setup Step is the same for the extended frame Note Image showing base setup Step is the s...

Page 64: ...64 Using Your Frame This section describes how to attach fabric and how to use the channel locks ...

Page 65: ... Tape Measure not included Write down the lengths and widths of the batting and backing so that when you place your quilt you can make sure it is centered and arranged as shown below 4 2 Cut your quilt batting so that it is 2 3 inches larger than the quilt top on all sides Cut your quilt backing so it is 6 8 inches larger than the quilt top 3 Batting 2 3 2 3 2 3 2 3 Quilt Top Quilt Top 6 8 6 8 6 8...

Page 66: ...oll the backing rail until the leader cloth is no longer visible Take your time to smooth out the wrinkles and keep the backing straight 4 Fold your quilt s backing in half to find the center Place a pin to mark the top and bottom center points 1 Top Bottom 2 Pin the bottom center point of your quilt backing to the center point at the bottom of the leader cloth on the backing rail with the right s...

Page 67: ... to the center point on the take up rail leader cloth 5 8 Work from the center out and pin the edges of the quilt backing and leader cloth together 6 9 Roll the backing rail until the quilt backing is smooth and free of creases 7 10 Backing Rail Take up rail Pin the top center of your batting 4 5 below to the top center of the quilt backing Top Center point Using Your Frame Attaching the Fabric Co...

Page 68: ...bunch around stitches when removed from frame Pin down the top of the quilt from the center out 12 15 Pin the bottom of the quilt top to the bottom of the final leader cloth Start from the center and work outward 13 16 Drape the bottom of the batting between the backing and top rails Backing Rail Top Rail Fold your quilt top to locate the top center point Place a pin to mark it Top Center point To...

Page 69: ... up the edges of the quilt slide the fabric into the bungee clamps Tension by pressing down on the bungee stops and pulling the bungee tail To return to a place you ve already quilted and rolled up loosen knobs on all the rails Then roll up the fabric on two front rails 17 18 19 Using Your Frame Attaching the Fabric Continued Take up Rail ...

Page 70: ...2 Instructions The channel locks assist with stitching in a straight line by inhibiting the movement of the bottom carriage or machine On both channel locks To prevent the rubber foot from loosening over time use needle nose pliers or a wrench to tighten the bottom 4 mm hex nut against the rubber foot Tighten the other hex nut against the channel lock barrel 3 Channel Lock Arm Rubber Foot 4 mm Hex...

Page 71: ... the frame and create a straight horizontal line close only the channel lock on the machine 6 5 To move the machine back and forth on the bottom carriage and create a straight vertical line close only the bottom carriage channel lock 4 Using Your Frame Using the Channel Locks Continued ...

Page 72: ...72 The Grace Company 2225 South 3200 West Salt Lake City UT 84119 Phone 1 800 264 0644 Fax 801 908 8888 www graceframe com ...

Reviews: