For technical product queries, please reach out to [email protected]
Thank you for purchasing a GPS-FC-48-AC air ionization system from Global Plasma Solutions.
Hardware Provided by GPS
Before you start, confirm the contents of your shipment. Each GPS-FC48-AC will consist of the
following
1. GPS-FC48-AC with in line power switch.
2. Rare earth magnets (2).
3. Machine screws and nuts (2 each) for mounting magnets.
Hardware by Others
1. Electrical wiring, junction box, or receptacle to provide power to the GPS-FC48-AC.
2. Self-tapping screws (optional) if not using magnet mount.
Installation Location
CAUTION: MAKE SURE POWER IS DISCONNECTED TO THE HVAC EQUIPMENT BEFORE INSTALLATION
GPS recommends mounting the GPS-FC48-AC on the blower housing on the side opposite the motor. Alternate
mounting locations are on the supply air duct or the return air duct after the system filter. The emitter brushes should
be no closer than two inches from any wiring or metal objects.
NOTE:
Use Temperature - Maximum Ambient temperature in which unit shall be used: 140 degree F/ 60°C
Mechanical Installation
1. Ensure power to the HVAC equipment and the circuit the GPS-FC48-AC will be connected to has been turned
off.
2. Find an appropriate location. Verify the carbon fiber emitters have a 2” clearance from wires or other metal
objects.
3. Mount the magnets to the GPS-FC48-AC using included hardware. See FIGURE 1.
4. Install the GPS-FC48-AC so that airflow is passing by both emitters at the
same time (like a football through goalposts).
5. Check that the wiper arm has room to rotate freely.
Figure 1
!