
INTRODUCTION
Section 1 - Page 4
STEP 3 – ICONS & SYMBOLS
Dotted line
Dotted line indicates assembly path/routing of bolts into parts
Arrow
Indicates direction of part for movement to assemble
Reverse Angle
Inset image showing the reverse/different angle
x2
Make 2
Indicates you need to repeat this step to build 2 items, or Left and Right.
Leave loose
Leave slightly loose (in some cases a future step will tighten)
Drill
Drill out existing hole with provided 2mm or 1.5mm drill bit
NO Drill
Do
NOT
drill holes (as bolt threads in)
Clean up
Clean up part/edges with scalpel and/or sand paper
Gentle
Exercise care and love and gently tighten!
Information
Indicates some extra information or hints or options
Very Important!
Highlights a very important item to take note
Check
Check your assembly matches the picture