GORMAN-RUPP AMT IPT 4222-V5 Specifications Information And Repair Parts Manual Download Page 2

Specifications Information and Repair Parts Manual  

     

IPT 2AG5LPE

2AG5-250-00

2

1/2021

Tighten adapter fasteners evenly to avoid cocking or damaging adapter.

13.  Replace impeller and shims, ensuring that key (Ref. No. 8) is in place and 

lock impeller to shaft with fastener and impeller seal on fastener.

14.  Replace volute seal and volute with fasteners, ensure that check valve 

(Ref. No. 12) is in place then remount casing seal and pump casing with 
fasteners and nuts.

IMPORTANT:

 Always inspect all seals when unit is disassembled. Replace 

when rubber is hard, cracked, or worn. 
When reassembling parts with O-ring seals or gaskets, it is sometimes helpful 
to apply a small amount of soapy water on O-ring so that parts slide over O-ring 
without pinching or shaving it.

SHIM ADJUSTMENT

When installing a replacement impeller or mechanical seal, it may be necessary 
to vary the number of shims (Ref. No. 21) that will be required. This is easily 
done by adding one 0.010” shim more than was removed and reassembling 
pump as described.

Ensure that casing is snugly in place and check shaft to make sure it is turning 
freely. If it turns freely, check to ensure that adapter (Ref. No. 3) and casing 

(Ref. No. 15) are fitted tight together. If they are not, tighten fasteners (Ref. 

No. 16) and recheck shaft for free turning. Tighten carefully, turning shaft while 
tightening. If shaft seizes before fasteners (Ref. No. 16) are completely tight, 
disassemble pump and remove one shim and repeat reassembly.

If any time during above operation shaft does not turn free, follow procedure 
indicated above and repeat procedure.

Above procedure ensures that pump will have proper running clearance (less 
than 0.010”) between impeller and casing and perform like a new unit with new 
impeller or motor.

IPT Series 2P5X, 2P5XC, 2S5X, 2S5XC & 3S5X Pumps

Reviews: