
INSTALLATION AND OPERATION INSTRUCTIONS
Section I. SERVICE UPON RECEIPT OF EQUIPMENT
Carefully unload the crated pump, using a lift truck
or other suitable means. Take care to prevent piercing
crates with forks of truck.
Remove the wooden crate carefully. Do not allow
pry bars, used for crate removal, to penetrate crate
interior. This could damage pump unit.
2-3. INSPECTING AND SERVICING EQUIPMENT
a. Inspect the pump for obvious damage which might
have occurred during shipment.
b . Inspect for loose or missing nuts, bolts, and other
attaching hardware. Check the suction and discharge
ports for damaged threads.
Note. The pump has been tested prior to shipment.
Since gaskets have a tendency to dry and
shrink after testing, make especially sure
that all bolts on gasket joints are tight in
order to prevent pump leakage.
c . Set the RUN-STOP switch in the STOP position
to prevent starting, and manually rotate the starting
pulley of the engine several turns to assure that the
engine has not seized and that the pump impeller
rotates freely without scraping or binding.
d. Perform all daily preventive maintenance services
for the engine described in TM 5-2805-259-14.
2-4. INSTALLATION OF SEPARATELY PACKED
COMPONENTS
a . The dry-charged, lead-acid storage battery is
shipped mounted in the battery box, but the electrolyte
is shipped separately. Add electrolyte to each cell
in the dry-charged battery until the electrolyte level
is above the battery plates. Do not overfill the battery.
Warning. The electrolyte for the dry-charged battery
consists of sulphuric acid. Use care when
b . Refer to figure 2-1 and connect battery cables;
replace cover.
Summary of Contents for 62-1/2E13-4A084
Page 4: ...PIN 008477 005...
Page 5: ......
Page 6: ......
Page 7: ......
Page 8: ......
Page 9: ......
Page 10: ......
Page 11: ......
Page 12: ......
Page 13: ......
Page 14: ......
Page 15: ......
Page 16: ......
Page 17: ......
Page 18: ......
Page 19: ......
Page 20: ......
Page 21: ......
Page 22: ......
Page 23: ......
Page 24: ......
Page 25: ......
Page 26: ......
Page 27: ......
Page 28: ......
Page 29: ......
Page 30: ......
Page 35: ...Figure 1 1 Centrifugal pump model 62 1 2E13 4A084 left rear three quarter view v...
Page 36: ......
Page 41: ...Figure 2 2 Figure 2 2 2 3...
Page 47: ...3 23 3 14 Figure 3 2 Quarterly preventive maintenance services 3 3...
Page 52: ...Figure 3 7 Battery and battery box disassembly and reassembly 3 8...
Page 54: ...Figure 3 10 Fuel tank lines and fittings disassembly and reassembly 3 10...
Page 59: ...Figure 3 13 Centrifugal pump exploded view 3 15...
Page 60: ...Figure 3 14 Cross sectional view showing seal and impeller installation 3 16...
Page 68: ...SECTION II SECTION II B 4...
Page 69: ...SECTION III SECTION III A 5...
Page 70: ......
Page 71: ...SECTION II B 5...
Page 72: ...SECTION II B 6...
Page 73: ...SECTION II B 7...
Page 74: ...SECTION III TM 5 2805 259 14 B 8...
Page 76: ......
Page 97: ...FIGURE NO C2 BATTERY BOX C 21...
Page 99: ...FIGURE C4 Figure No C4 Pump C 23...
Page 100: ...FIGURE NO C5 FIGURE C5 C 24...
Page 104: ......
Page 105: ......
Page 106: ...TM 5 4320 249 14 TM 5 4320 249 14...