![GORMAN-RUPP PUMPS 02K11-X2 1P Installation, Operation, And Maintenance Manual With Parts List Download Page 7](http://html1.mh-extra.com/html/gorman-rupp-pumps/02k11-x2-1p/02k11-x2-1p_installation-operation-and-maintenance-manual-with-parts-list_2246775007.webp)
0 SERIES
OM-01060
PAGE A - 2
SAFETY
the applicable local code, the National
or local code shall take precedence.
Because this pump is designed to han
dle volatile and/or flammable liquids,
overheating may produce dangerous
fumes. Take precautions to ensure the
area surrounding the pump is ade
quately ventilated. Allow the pump to
cool and use extreme caution when
venting the pump, or when removing
covers, plates, plugs, or fittings.
After the pump has been positioned,
make certain that the pump and all pip
ing connections are tight, properly sup
ported and secure before operation.
Do not remove plates, covers, gauges,
pipe plugs, or fittings from an over
heated pump. Vapor pressure within the
pump can cause parts being disen
gaged to be ejected with great force. Al
low the pump to cool before servicing.
Do not operate the pump against a
closed discharge valve for long periods
of time. If operated against a closed dis
charge valve, pump components will
deteriorate, and the liquid could come
to a boil, build pressure, and cause the
pump casing to rupture or explode.
Overheated pumps can cause severe
burns and injuries. If overheating of the
pump occurs:
1. Stop the pump immediately.
2. Ventilate the area.
3. Allow the pump to completely cool.
4. Check the temperature before
opening any covers, plates,
gauges, or plugs.
5. Vent the pump slowly and cau
tiously.
6. Refer to instructions in this manual
before restarting the pump.
The electrical power used to operate
this pump is high enough to cause inju
ry or death. Obtain the services of a qu
alified electrician to troubleshoot, test
and/or service the electrical compo
nents of this pump.
Death or serious personal injury and
damage to the pump or components
can occur if proper lifting procedures
are not observed. Make certain that
hoists, chains, slings or cables are in
good working condition and of suffi
cient capacity and that they are posi
tioned so that loads will be balanced
and the pump or components will not be
damaged when lifting. Suction and dis
charge hoses and piping must be re
moved from the pump before lifting. Lift
the pump or component only as high as
necessary and keep personnel away
from suspended objects.
Pumps and related equipment must be in
stalled and operated according to all na
tional, local and industry standards.