
ASSEMBLING MOBILE BASE UNIT
To assemble the Mobile Base unit, remove the unit from its packaging
and ensure that all parts are present. With the unit on its side, locate
each of the four aluminium 5” standard castor wheels into each corner
and secure with the locking pin supplied. Once each wheel is securely
located, ensure that they are locked position.
1.
Stand the Base unit upright with the support of two persons. Once the
frame has been put into the open position, you are then able to locate the
platform with hatch onto the 3
rd
rung of the 6-rung ladder (count from the
bottom to the top). Lock it in place and inspect the stability.
2.
Note: All locking graspers should be primed before use, and released for
dismantling or relocation.
Locate the two guard rails onto the 5
th
and 6
th
rungs to provide additional
safety and support.
3.
7
www.gorillaladders.co.nz