3.5M ALUMINIUM
MOBILE SCAFFOLD
USER GUIDE
Please read this guide before use.
www.gorillaladders.co.nz
Page 1: ...3 5M ALUMINIUM MOBILE SCAFFOLD USER GUIDE Please read this guide before use www gorillaladders co nz...
Page 2: ...HER CONSIDERATIONS The Gorilla Mobile Scaffold system is not designed to withstand heavy exposure to rain Although this system is designed to the highest standards please be aware that the life of you...
Page 3: ...Quantity Schedule of Scaffolding Refer to page 12 2 www gorillaladders co nz...
Page 4: ...ound for laying the scaffold must be solid i e not water or loose sand and should not be positioned to overload individual legs Adjustable stabilisers should only be used for levelling To meet NZ Heal...
Page 5: ...cted within the scaffolding base Ensure that the safe working load of the supporting decks and the scaffolding structure is not exceeded The assembled scaffolding is a working platform and should not...
Page 6: ...PLES To dismantle your Gorilla Scaffold Remove toe boards and pass down the scaffolding Unclip farthest end of braces and immediately go to protected trapdoor position on ladder to complete removal Re...
Page 7: ...djusted Guard rails fitted Diagonal braces horizontal braces and bottom brace fitted Stabilisers fitted as specified Platforms located and windlocks on Toe boards installed CHECK LIST IMPORTANT NOTE F...
Page 8: ...hey are locked position 1 Stand the Base unit upright with the support of two persons Once the frame has been put into the open position you are then able to locate the platform with hatch onto the 3r...
Page 9: ...t platform and locate them on top of the Base unit frames Lock into position using the provided locking pins 4 Locate the diagonal braces Clip the diagonal braces onto the lowest rung of the Tower fra...
Page 10: ...end of stabiliser onto the second set ladder frame lower end onto the first set ladder frame 6 Repeat Step 2 Add the platform with hatch to the 2nd rung of the second set of the 6 rung ladder frame Lo...
Page 11: ...ces Insert guard rails into the top of the frame vertically then lock it with the lock catch Clip horizontal braces to one side of the guard rail making the scaffold to be a square The operator must s...
Page 12: ...the top of the first set ladder frame and the secondset one respectively Fit toe boards to working platform the upper platform with hatch The full Mobile Scaffold system is complete 9 ASSEMBLING TOE B...
Page 13: ...Hatch 4 5 Standard Castor Wheels BASE PACK Qty Component 2 1000 x 680mm Guard Rail 4 1400mm Horizontal Brace RISER PACK Qty Component 2 1782 x 680mm Six Rung Frame 1 1400 x 600mm Platform with Hatch...
Page 14: ...www gorillaladders co nz APRIL 2018...