background image

8.

9.

Add Roof Support Beams. Position E poles, then F pole. 
E poles are load bearing.

W W W . G O R I L L A G R O W T E N T . C O M 1 - 8 5 5 - G G T - G R O W

4

4

4

7

6

9

8

TALLEST. THICKEST. STRONGEST.

Place spill pool on floor of tent and secure Velcro straps around poles.

Reviews: