Gorenje GBF 100 Instructions For Use Manual Download Page 25

25

LA

V

Cien tais pirc j, m s esam Jums pateic gi par m su ražojuma pirkumu.

L DZAM J S PIRMS  DENS SILD T JA UZST D ŠANAS UN PIRM S LIETOŠANAS 

UZMAN GI IZLAS T ŠO INSTRUKCIJU.

IER CE  NAV  PAREDZ TS  IZMANTOT  PERSONAS  (TAI  SKAIT   B RNI)  AR 

IEROBEŽOT M FIZISK S, SENSOR S VAI GAR GO SP JU, VAI NESP JA PIEREDZE 

UN ZIN ŠANAS, JA VIEN TIE IR DOTA UZRAUDZ BA VAI INSTRUKCIJU PAR TO, K  

IZMANTOT T DU IER CES P C PERSONAS ATBILD PAR TO DROŠ BU

B RNIEM, TIEK KONTROL TAS, LAI NODROŠIN TU, KA TIE NAV SP LE KOP  AR 

IER CI.

dens  sild t js  ir  izgatavots  saska   ar  sp k   esošiem  standartiem,  p rbaud ts,  tam  ir 

ar  droš bas sertiik ts un elektromagn tisk s savietojam bas sertiik ts. Apar ta galvenie 

tehniskie  dati  ir  nor d ti  Inform cijas  tabul ,  kura  atrodas  starp  piesl gšanas  š ten m. 

Apar tu  piesl gt  elektrot klam  un  densvadam  dr kst  tikai  pilnvarots  speci lists.  Iekš jo 

ier ču apkalpošanu, katlakmens no emšanu, p rbaudi vai pretkorozijas aizsardz bas anoda 

nomai u ar  dr kst veikt tikai pilnvarots servisa dienests.

MONT ŽA

Sild t js j uzst da cik vien iesp jams tuv k  dens pievada viet m. Uzst dot  dens sild t ju, 

kas istabu ar vannu vai dušu kubls,  em v r  pras bas, kas noteiktas IEC Standard 60364-

7-701 (VDE 0100, Part 701).Pie sienas tas j piestiprina, izmantojot sienas skr ves ar 8 mm 

minim lu nomin lu diametru. Sienas ar v ju slodzes iztur bu viet , kur tiks uzst d ts sild t js, 

attiec gi j pastiprina. Pateicoties tam, ka sild t ju konstrukcija ir univers la, tos var uzst d t 

uz sienas vertik l  st vokl  vai horizont li (pie tam izejas caurul m j b t kreisaj  pus ).

APAR TA TEHNISKIE DATI

GBFU 50 E/V6

GBFU 80 E/V6

GBFU 100 E/V6

GBFU 120 E/V6

GBFU 150 E/V6

A

596

816

961

1116

1331

B

365

565

715

865

1065

C

185

205

200

205

220

D

145

345

495

645

845

Sild t ja pievienošanas un mont žas izm ri (mm)

Summary of Contents for GBF 100

Page 1: ...GBFU 50 150E V6...

Page 2: ...2...

Page 3: ...3 Instructions for use 14 Instrukcij 20 Instrukcija 25 4 9...

Page 4: ...4 IEC 60364 7 701 VDE 0100 701 8 GBFU 50 E V6 GBFU 80 E V6 GBFU 100 E V6 GBFU 120 E V6 GBFU 150 E V6 A 596 816 961 1116 1331 B 365 565 715 865 1065 C 185 205 200 205 220 D 145 345 495 645 845 UA...

Page 5: ...100 E V6 GBFU 120 E V6 GBFU E150 E V6 50 80 100 120 150 0 6 24 74 30 110 34 134 38 158 44 194 2000 2 x 1000 230 I IP 25 75 1 155 305 355 435 545 40 96 80 151 130 199 174 238 210 296 260 2 24 1 32 1 4...

Page 6: ...6 0 8 1 2 3 4 5 H T 1 5 2 1 2 3 1000 W 5 L N 10 C 75 C e 55 C UA...

Page 7: ...7 10 C Test UA 10 C 35 C 55 C 75 C...

Page 8: ...8 UA Mg...

Page 9: ...RUS c o IEC 60364 7 701 VDE 0100 701 K c 8 GBFU 50 E V6 GBFU 80 E V6 GBFU 100 E V6 GBFU 120 E V6 GBFU 150 E V6 A 596 816 961 1116 1331 B 365 565 715 865 1065 C 185 205 200 205 220 D 145 345 495 645 84...

Page 10: ...6 GBFU 120 E V6 GBFU E150 E V6 50 80 100 120 150 0 6 24 74 30 110 34 134 38 158 44 194 Mg 2000 2 x 1000 230 I IP 25 75 C1 155 305 355 435 545 40 C 96 80 151 130 199 174 238 210 296 260 2 24 1 32 1 45...

Page 11: ...11 c B c 3 1 2 3 4 5 K 1 5 2 H05VV F 3G1 5 2 1 2 1000 5 L N RUS...

Page 12: ...12 10 C 75 C E 55 C 0 10 C I 35 C E 55 C III 75 C Mg Mg Mg Mg Mg Mg RUS...

Page 13: ...13 Mg Mg ry c o ry a RUS...

Page 14: ...tion must be carried out by qualiied staff All repairs and maintenance work within the water heater e g lime removal or inspection replacement of the protective anti corrosion anode must be carried ou...

Page 15: ...n circuit gravity system enables a single point of use only The mixer taps must also be purchased in accordance with the selected installation mode The open circuit gravity system requires the install...

Page 16: ...e without reduction valve if the pressure in the network is lower than 0 5 MPa 5 bar If the pressure exceeds 0 5 MPa 5 bar a reduction valve must be installed Prior to the electric connection the wate...

Page 17: ...rature of water lowing through the water heater The maintenance service provider shall also issue a condition report and recommend the approximate date of the next inspection Never try to repair any p...

Page 18: ...In this case open the hot water tap fresh water low into water heater If the signal lamp switches off the water heater operation is not impaired If not call the nearest authorized service provider Tem...

Page 19: ...nspections should be carried out by the authorized maintenance service provider about two years from installation in order to inspect the wear of the protective anticorrosion anode and remove the lime...

Page 20: ...autorizuota tarnyba ar galiotas specialistas Garantin ir pogarantin aptarnavim ir remont nuovir pa alinim antikorozinio anodo patikrinim ar pakeitim gali atlikti tik gamintojo galiota serviso tarnyba...

Page 21: ...riklausomai nuo pasirinktos sistemos turi b ti montuojami atatinkami vandens mai ytuvai Atviroje vandens pajungimo sistemoje prie ildytuv b tina pastatyti atbulin vo tuv kuris neleis kar tam vandeniui...

Page 22: ...ti kar to vandens padavimo iaup ildytuvas bus pilnai u pildytas kai i kar to vandens iaupo prad s b gti vanduo PAJUNGIMAS PRIE ELEKTROS TINKLO D mesio is renginys skirtas prijungimui prie kintamos sro...

Page 23: ...ir temperat ros nustatymo jungiklis bei b kl s signalin lemput Valdymo pultelis Sukam jungimo ir temperat ros nustatymo jungikl galima nustatyti sekan ioms pad tims Mygtuko pad tis Reik m 0 aparatas y...

Page 24: ...lite i tu tinti ir tiesiai per apsaugin vo tuv pasuk ranken l arba vo tuvo sukam j kepur l veikimo patikrinimo pad t Prie tu tinant ildytuv reikia i jungti i elektros tinklo ir tada jungti ilto vanden...

Page 25: ...lam un densvadam dr kst tikai pilnvarots speci lists Iek jo ier u apkalpo anu katlakmens no em anu p rbaudi vai pretkorozijas aizsardz bas anoda nomai u ar dr kst veikt tikai pilnvarots servisa dienes...

Page 26: ...as Atkl taj caurteces sist m pirms dens sild t ja j uzst da pretv rsts kas nov rs s dens nopl di no katla gad jum ja densvad neb s dens Izmantojot t du piesl g anas sist mu j uzst da caurteces mais t...

Page 27: ...ju elektrot klam tas oblig ti j piepilda ar deni Pie pirm s uzpild anas pagrieziet karst dens rokturi uz mais t ja Sild t js ir piepild ts kad dens s k tec t no mais t ja izpl des caurules PIESL G AN...

Page 28: ...pane a ir rot jo a poga izmantota lai iesl gt sild t ju un temperat ras uzst d anai Tur atrodas ar sign llampa lai nor d t darb bas re mu Vad bas panelis Rot cijas pogu poz cija jaudas un temperat ras...

Page 29: ...un iepl des cauruli attiec gu izpl des v rstu vai T veida savienojumu Pret j gad jum J s varat iztuk ot sild t ju ar caur dro bas v rsta izpl des atveri im nol kam pagrie ot sviru vai v rsta rot jo o...

Page 30: ...30...

Page 31: ...31...

Page 32: ...05 2009 270286...

Reviews: