7
UK
STEP 3: Connecting the Solid Linkage
1. Push the flow control handle to the “30” position. Insert the A end of the connect-
ing rod (#34) through the Ø8 flat washer (#12) and into the hole on the gauge level
plate (#46). Secure with a M8 lock nut (#11).
2. Insert the B end of the connecting rod (#34) through the Ø8 flat washer (#12) and
into the hole on the fixed plate (#13). Secure with M8 lock nut (#11).
3. Push the control handle to the “0” position. The hole in the bottom of the spreader
should be completely closed. If the flow control handle position and the hole in the
bottom of the hopper does match exactly, loosen the two bottom M6 lock nuts (#9)
and move the gauge level plate until the handle position and the hole in the bottom
of the hopper match. Re-tighten the two M6 lock nuts (#9).
Summary of Contents for FGP455600GP
Page 4: ...4 UK COMPONENT PARTS...
Page 13: ...13 UK PARTS DRAWING PARTS LIST...
Page 26: ...26 DE TEILEZEICHNUNG UND TEILELISTE...
Page 39: ...39 FR SCH MA ET LISTE DES PI CES...
Page 52: ...52 NL TEKENING EN LIJST VAN ONDERDELEN...
Page 65: ...65 DK TEGNING OVER DELE OG STYKLISTE...
Page 78: ...78 ES DIAGRAMA Y LISTA DE PIEZAS...
Page 91: ...91 IT DISEGNO DEI COMPONENTI ED ELENCO DEI COMPONENTI...
Page 104: ...104 PL RYSUNEK I WYKAZ CZ CI...