Summary of Contents for SMT Series

Page 1: ...SMT Series Quick Installation Guide Ver 1 0 2021 06 30 ...

Page 2: ...arranty details please visit http www goodwe com General Disclaimer DC Side 1 Ensure the component frames and the bracket system are securely grounded 2 Connect the DC cables using the delivered DC connectors and terminals The manufacturer shall not be liable for the equipment damage if other connectors or terminals are used 3 Ensure the DC cables are connected tightly and securely 4 Measure the D...

Page 3: ...rts and terminals are sealed 5 The voltage and frequency at the connection point meet the on grid requirements Check Items Before Switching Power ON High voltage hazard Power off the inverter first before any operations Potential risks exist Wear proper PPE before any operations Read through the guide before any operations Delayed discharge Wait until the components are totally discharged after po...

Page 4: ... LCD 2 8 Button 9 Mounting Plate 10 Handle 3 11 Fan 12 PE Terminal 02 Product Introduction 1 2 3 4 5 7 6 8 9 9 11 12 10 480mm 590mm 200mm 360mm 180mm 412mm 360mm 180mm 180mm 180mm Parts Dimensions 1 DRED or RSD or RS485 or USB depending on different inverters 2 Some models are designed without LCD 3 The handle is optional ...

Page 5: ...PIN terminals screws COM connector PV connectors are various depending on different inverters The actual accessories may be different Communication module types WiFi 4G LAN GPRS etc The actual module delivered depends on the communication method of the selected inverter The COM connector is used to connect RS485 and remote shutdown communication cables USB cable is optional Packing List Space Requ...

Page 6: ...05 15 1 2 3 A B C D Avoid the water pipes and cables buried in the wall when drilling holes Angle Requirements Installing the Inverter 0 100 RH 30 60 IP65 ...

Page 7: ...06 04 Electrical Connection L L1 1 2 mm L1 Copper S 4mm2 M5 1 2 2N m 1 2 3 Connecting the PE Cable 4 1 2 4 1 5 M5 1 6 2N m 3 3 1 Installing inverters without handles Installing inverters with handles ...

Page 8: ...07 Connecting the AC Cable L1 L2 L3 N PE 1 2 3 4 5 1 2 2 3 1 Φ 22 30mm 90mm 12 36kW 10mm2 S 25mm2 40kW 16mm2 S 25mm2 70mm 11mm 3 4 2 3 4 N PE L1 L2L3 M3 0 6 0 8N m 3 M6 3 8 4 2N m 2 1 ...

Page 9: ...08 7 8mm 7 8mm 1 2 3 4 2 3 4 1 1 2 3 2 5mm2 S 4mm2 Φ 4 5mm 1 1 4 5 2 2 Click Click 1100V Click Connecting the DC Cable ...

Page 10: ...B1 3 RS485 A1 4 RS485 B1 5 RS485 A2 6 RS485 B2 Connecting DRED or RS485 6pin Communication Cable optional 3 2 5 1 4 M2 0 3 0 4N m 1 2 3 4 5 6 1 2 1 2 2 1 6 5mm 25mm 2 1 3 4 5 6 7 NO DRED 1 DRED1 2 DRED2 3 DRED3 4 DRED4 5 REF1 6 REF2 ...

Page 11: ...10 Connecting USB Cable optional Connecting Remote Shutdown 2pin Communication Cable optional 6 5mm 25mm 1 3 6 3 2 1 4 5 4 M3 0 6 0 8N m 5 3 2 2 2 1 2 1 NO Function SC A SC B ...

Page 12: ...11 Connecting RS485 5pin Communication Cable optional 1 3 4 M3 0 6 0 8N m 5 2 2 6 5mm 25mm 2 2 1 3 6 2 1 4 5 1 3 4 5 1 2 NO Function 1 RS485 A1 2 RS485 B1 3 RS485 A1 4 RS485 B1 5 Gen ...

Page 13: ... set the safety country via the LCD or SolarGo APP For more details refer to Commissioning part For other settings please refer to the user manual 2 Observe the indicators to check the inverter status If any fault exists please refer to the Troubleshooting part in the user manual User Manual PV String PV String AC Switch Grid Inverter OFF ON DC Switch 1 2 ...

Page 14: ...nverter is on grid Off Off grid Single Green Blinking Slowly Self check before grid tying Single Green Blinking Quickly The inverter is to be grid tied Steady Green The wireless monitoring is normal Single Green Blinking Quickly WiFi module reset or restore Double Green Blinking Not connected to the router Quartic Green Blinking Not connected to the monitoring website Single Green Blinking Slowly ...

Page 15: ...you are advised to change the password periodically and keep the new password in mind Note 4 2 1 3 5 Basic setting Connection Jump off setting 4 21 PM 100 VIRGIN Grid connection parameters Safety option Grid connection VDE4110 Triangle Grid 3W PE 6 Initial password for Bluetooth WiFi 1234 Initial Password for GPRS or 4G the last 4 digits of the inverter bar code Commissioning via SolarGo APP Blueto...

Page 16: ...JIANGSU GOODWE POWER SUPPLY TECHNOLOGY CO LTD No 90 Zijin Rd New District Suzhou 215011 China www goodwe com service goodwe com SEMS Portal App GOODWE Official Website SolarGo App 340 00559 01 ...