17
06 System Operation
User Manual V1.0-2022-02-18
6.1 Check Items Before Switching Power ON
No.
Check Item
1
The inverter is firmly installed in a clean place where is well-ventilated and easy to
operate.
2
The PE cable, power cable, communication cable, and terminal resistance are
connected correctly and securely.
3
Cable ties are routed properly and evenly, and no burrs.
4
Unused ports and terminals are sealed.
Check the following items before power on to avoid the System be damaged.
5.5 Install the protection cover
06 System Operation
Turn on the Circuit Breaker.
6.2 Battery Module Power On