Request for Information (RFI)
35: DS-1 Air conditioner
TO:
FROM:
Brett Sichello
326 Uplands Drive
Kelowna, V1W4J7
United States
Joe Dees
881 Highway 33 E
Kelowna, BC , V1X 6V1
Canada
PROJECT:
ISSUE DATE:
Penticton Kiwanis
150 Van Horne Street
Penticton, BC, V2A 4K2
Canada
07/22/10
STATUS:
Closed on 07/27/10
PROJECT NUMBER:
RFI NO:
SC-415
35
COPIES TO:
REQUESTED REPLY DATE:
Ben Duckworth (Scuka Enterprises Ltd)
Lisa Duckworth (Scuka Enterprises Ltd)
Colin Leslie (Leslie Engineering Corp)
Joe Dees (Scuka Enterprises Ltd)
07/25/10
SUPPLEMENTAL RFI INFORMATION:
COST CODE:
REFERENCE:
LOCATION:
DRAWING NUMBER:
M-03
SPECIFICATION SECTION:
RFI DESCRIPTION [QUESTION 1] :
(Fully describe the question or type of information requested.)
Posted by Joe Dees
Hi All,
The question from Ben (Sandhill Mechanical).
Can the DS-1 air conditioner be moved from its current identified location to the east wall (beside where the door swings to) so the condensate
drain can be tied in to existing drainage system, as in its present location a condensate pump would have to be installed.
Thank you for your time,
Joe Dees
REFERENCES / ATTACHMENTS
(List specific documents researched when seeking the information requested.)
• None
RECEIVER'S REPLY:
(Provide answer to RFI, including cost and/or schedule considerations.)
Response From Brett Sichello At 07/27/10 at 02:41 PM