Thank you for placing trust in our company and for purchasing our product.

 

OPERATING AND ASSEMBLY MANUAL - ELECTRIC TANKLESS WATER HEATER   

FOR CENTRAL HEATING SYSTEMS

 

                          TYPE 

EKW AsZN-W, AsD-W AsDC-W, ASB II

 

(Electric water boiler) 

APPLICATION 

 

All of the GoldLine (EKW AsZN-W, EKW AsD-W, EKW AsDC-W, EKW AsBII) boilers are 
designed to provide heating to small and medium sized locations equipped with 
either open or closed low temperature (T<100°C) central heating water systems.

 

Boilers EKW: AsZN-W, AsD-W, AsDC-W in closed central heating system:

 

Boilers are designed for autonomous operation in both open and closed central 
heating systems. Those boiler types come with a safety unit, 8l membrane vessel 
and CH pump (*HUW pump in AsD-W and AsDC-W as well). 

 

AsB II 27 ÷ 48 kW in closed central heating system:

 

In closed heating system CH installation needs to be equipped in membrane vessel. 
The membrane vessel is not supplied with the boiler.

 

AsB II 54 ÷ 144 kW in closed central heating system:

 

In closed heating system CH installation needs to be equipped in membrane vessel 
and CH pump. The membrane vessel and CH pump are not supplied with the boiler.

 

TABLE OF CONTENTS

 

BOILER DESIGN. . . .. . . . . . . . . . . . . . 2

 

HYDRAULIC AND   
ELECTRICAL ASSEMBLY . .. . . . . . . . . 5

 

BOILER START-UP . . . . . . . . . . . .. . . 7

 

SETTINGS. . . . . . . . . . . . . . . . . . . . . . 8

 

REFERENCE DIAGRAMS . . . . . . . . . 17

 

DECLARATIONS OF CONFORMITY. 18

 

DIMENSIONS:

 

EKW AsB II

 

EKW AsZN-W

 

EKW AsD-W

 

410

 

270

 

EKW AsDC-W

 

455mm

 

455mm

 

680

 

680

 

680

 

POWRÓT

 

ZASILANIE

 

50

 

235

 

410

 

270

 

50

 

225

 

55

 

410

 

270

 

120

 

105

 

21

 

21

 

1

 

55

 

1

 

50

 

1

 

50

 

1560mm

 

Summary of Contents for AsB II

Page 1: ...ER HEATER FOR CENTRAL HEATING SYSTEMS Electric water boiler TYPE EKW AsDC W AsDC W AsZN W AsB II AsD W AsZN W AsB II GoldLine AsD W Intelligent AntiStop system ZŁOTY CERTYFIKAT PRZEDSIĘBIORSTWO ZŁOTY CERTYFIKAT GRAND PRIX EKO BUD 97 FAIR PLAY 2001 2009 2001 2010 GoldLine ...

Page 2: ...ON OFF Boiler EKW AsDC W RETURN RETURN SUPPLY 54 cm 14 17 21 19 13 16 5 4 3 Min Premises height 2 1m required while installation VENT MANOMETER 4 BAR Boiler EKW AsDC W With build in HUW tank exemplary application c 11 53 33 12 0 5 20 11 czw c 1234 56 CONTROL PANEL ESC ON OFF INSIDE BOILER CH PUMP HUW PUMP 8l CH MEMBRANE VESSEL 2X ONE WAY VALVE 100l HUW TANK 20 circulation HUW outflow CH Cold water...

Page 3: ... 3 14 17 13 5 6 Boiler EKW AsB II 10 15 8 7 8 9 10 3 8 automatic vent 11 Terminal strip 11 3 4 5 7 9 12 12 Relays 13 Feed stub pipe 3 4 AsB II 1 14 Return stub pipe 3 4 AsB II 1 15 Manometer 4 bar 16 Safety valve 3 bar 17 CH pump up to 48kW c 11 53 3312 05 2011 czw c 123456 18 8 l membrane vessel 19 HUW pump 20 100l tank 21 Return stub pipe HUW 22 Room sensor terminal strip 23 Floor sensor termina...

Page 4: ...Those boiler types come with a safety unit 8l membrane vessel and CH pump HUW pump in AsD W and AsDC W as well AsB II 27 48 kW in closed central heating system In closed heating system CH installation needs to be equipped in membrane vessel The membrane vessel is not supplied with the boiler AsB II 54 144 kW in closed central heating system In closed heating system CH installation needs to be equi...

Page 5: ...unions for CH and HUW pumps supplied with boiler 1 Feed stub pipe male thread on the boiler s right side no 13 2 Return stub pipe male thread on the boiler s left side no 14 3 Return stub pipe for HUW male thread in the middle no 21 5 EKW AsD W BOILER c 11 53 3312 05 2011 czw c 123456 ESC ON OFF ONE WAY VALVES CH HUW SUPPLY RETURN E EKW AsDC W All male threads top view 80 60 60 50 120 ATTENTION Co...

Page 6: ... the electric installation by a device enabling full power disconnection It is also required to use residual current device in case house installation lacks such A Connection strip 1 HUW measuring sensor concerns AsD W boiler no 24 0 VOLT ESC ON OFF RELAYS Sensors ELTERM Body BALL CH HUW ROOM WEATH EKW BOILER START UP 2 room sensor ELTERM optional clamps no 22 3 weather sensor no 23 4 external roo...

Page 7: ...3 by 1 6 by 1 6 by 1 6 by 1 6 by 1 6 by 1 6 by 1 6 1 phase 3 phases 1 phase 3 phases 1 phase 3 phases 3 phase 3 phases 3 phase 3 phases 3 phase 1 x 20 3 x 6 1 x 32 3 x 10 1 x 40 3 x 16 3 x 20 3 x 25 3 x 32 3 x 40 3 x 40 3 x 2 5 5 x 1 5 3 x 4 5 x 2 5 3 x 10 5 x 2 5 5 x 4 5 x 4 5 x 6 5 x 6 5 x 10 50 50 70 70 110 110 150 180 220 260 300 70 70 100 100 150 150 210 250 310 360 400 5x35 5x50 5x50 5x50 5x...

Page 8: ...anguage selection 4 On LCD sign venting progress bar One cannot skip this part CH optionally HUW pump turns on there is no possibility to disconnect heaters Those 5 minutes should be sufficient to vent whole system including boiler and pump In case however another venting is essential please repeat previous step 5 On LCD information according to description on page 7 4 Venting 5 c 11 53 33 12 05 2...

Page 9: ...re is then increased by weather correction value i e boiler s temperature set temperature weather correction where correction factor depends on our choice For each grade below 15 C weather correction equals for 1 for 2 for 3 for 4 for 5 for 6 for 7 for 8 for 9 for 10 Examples Weather curve set at 5 boiler CH temperature 30 C For outside temperature higher than 15 C boiler will keep 30 C For extern...

Page 10: ...d HUW DATE TIME current PID P 1 2 3 4 5 CH HISTERESE 1 2 3 4 5 6 C HUW HISTERESE 1 2 3 4 5 6 C DEF SETTINGS CONTROLS ROOM OPTIONAL 9 programs CONTROLs HUW OPTIONAL 9 programs ad A1 SETTINGS ENERGY CONSUM VENTING POWER SECTIONS DATE TIME PID P CH HISTERESE 66 1 2 B ENERGY CONSUMPTION C VENTING CH and HUW Ad A1 SETTINGS POWER EKW boiler press 1 time SETTINGS sign appears press 2 times POWER sign app...

Page 11: ...we turn off CH function when we turn off HUW function ON ON HUW CH ON ON OFF section inactive ON section active BACK given parameters are set Multiple press enables getting back to main menu CH CH ad A3 Ad A3 SETTINGS DATE TIME press 1 time SETTING sign appears press 2 times DATE TIME sign appears to enter press twice button on the right press another time below screen appears Date time and weekda...

Page 12: ...me PID P function is visible POWER SECTIONS DATE TIME PID P CH HISTERESE 66 1 2 BACK given parameters are set Multiple press enables getting back to main menu PID P DEFAULT 2 ad A5 Ad A5 SETTINGS CH HISTERESE press 1 time SETTING sign appears press 2 times CH HISTERESE sign appears to enter press four times button on the right press another time below screen is visible CH HISTERESE decrease hister...

Page 13: ...W HISTERESE DEFAULT 4 Ad A7 SETTINGS DEF SETTINGS press 1 time SETTINGS sign appears press 2 time DEF SETTINGS sign appears to enter press six times button on the right press another time below screen is visible DEF SETTINGS NO resigning from default settings YES OK approving default settings activating default settings HUW temperature 50 C CH temperature 50 C Bioler power 100 HUW sections ON CH s...

Page 14: ... of two temperature ranges overlapping the one with higher more comfort temperature is chosen 2 In case of a program overlapping with INITIAL SETTINGS pt I ad 1 boiler will heat according to chosen program variant Variant I II III IV V VI VII MO TU WE TH FR MO MO MO MO MO TU TU WE WE TU WE WE TH TH TH FR FR SA SA SU SA TH FR FR WEEKDAY PROGRAMING SA SU SU SU SU All days active 4 days active 3 days...

Page 15: ... TU WE START STOP TEMP ACTIVE ad A8 TH FR SA SU 08 03 16 00 NR 25 C YES TH FR SA SU 08 03 16 00 NR 25 C YES Ad A9 SETTINGS PROGRAMS HUW OPTIONAL press 1 time SETTINGS sign appears press 2 time PROGRAMS HUW sign appears to enter press seven times button on the right SETTINGS ENERGY CONSUM VENTING press another time settings menu is visible change parameter change parameter s value BACK given parame...

Page 16: ...umed energy in kWh since measurement start for max 24h After 24h counter stops autamatically LAST 24H counter shows actual energy consumption for the last 24h update every 20 min BACK given parameters are set Multiple press enables getting back to main menu ad A9 SETTINGS ENERGY CONSUM VENTING RES COUNTER LAST 24h RST Ad A10 VENTING 1 Function enables additional system venting without turning boil...

Page 17: ...CK given parameters are set Multiple press enables getting back to main menu REFERENCE DIAGRAMS Exemplary application of AsZN W boiler Max Operation temperature 40 C AsZN W boiler in floor heating instalation AsZN W as an independent heat source AsDC W boiler With build in HUW tank exemplary diagram AsZN W boiler with HUW tank heating large quantities of water in short time circulation HUW outflow...

Page 18: ...mended Nr 2002 95 WE as amended Nr 2002 96 WE as amended and that the standards hereinafter referred to have been duly applied and observed The last two digits of the year of the CE marking application 08 The harmonized standards applicable to the product to which this declaration of conformity pertains Number PN EN 60335 1 Issue Title 94 A11 95 A1 96 A12 96 A13 98 A14 98 A2 2000 Safety of househo...

Page 19: ...urn protection against dew effect Required along with new solid fuel CH boilers installation guarantee terms Pump work regulation according to temperature differences supply vs return turns pump off when low supply temp occurs In case there is no separate safety pipe in CH boiler will not be cut off from open system vessel as it happens in case of 3 and 4 way valves Floor heating s pump module wit...

Page 20: ... Programming with accuracy of 1 min 9 independent programs Actual temperature setting Accurate hysteresis from 0 1 C to 1 C Removable steering panel safe installation Build in installator mode 16A relay Non volatile memory Advantages of PT controller LED display Intelligent Anti Stop system Anti freeze Simple handling Electric towel rails and bathroom heaters ECO 70 110 W and ECOTERM 320 800 W wit...

Reviews: