
23
3. Replace the plug in the pump outlet with the
straight barb provided.
4. Drill out the holes for mounting the boom
support on top of the tank, using the support
itself as a template.
5. Attach the support to the tank using the M6
x 50 bolts with M6 plain washers and M6 Nyloc
nut. The nuts need to be inserted through the
tank fill opening and tightened inside the tank.
6. Attach the boom to the boom support using
the p-clips with M6 x 25 bolt, M6 plain washers
and M6 Nyloc nut as shown.
7. Heat up one end of the plumbing hose and
push it onto the barb previously fitted to the
pump. Secure with hose clamp.
Continued over page
Upgrade Procedure - Spotmate 100
8. Feed the other end of the hose through the
opening in the boom support.