Serires KMI
- 13 -
November 4, 2013
Goch GmbH & Co. KG
Air Plate Installation Instructions
Single Stage Infrared Heaters
Before the orifice housing is mounted to the Venturi neck, the Air Plate and orifice
sizes must be compared with the Rating plate specifications.
Procedure:
Remove the cable ties (not shown) from the Venturi Neck (some infrared heaters do
not have any air plates, and therefore no cable ties)
Push the orifice housing into the Venturi Neck and screw it tight using four M5 screws
provided.
M5 Screws
(QTY 4)
Air Plate
Venture
Neck
Orifice
Orifice
Housing
Single-Stage Version