![GoFit ELEVATED CHIN UP STATION Assembly Instructions Download Page 2](http://html.mh-extra.com/html/gofit/elevated-chin-up-station/elevated-chin-up-station_assembly-instructions_2238494002.webp)
Metal Wedge
ELEVATED CHIN UP STATION
For questions or missing parts, please contact GoFit at 888-530-4441
©2012 GOFIT, L.L.C. TULSA, OK
With pointed end down, slide
Metal Wedge downward, behind door
frame/moulding.
Position bottom edge of Plastic
Leverage Bar into the installed safety
wedge, guiding it down to securely
rest on top of door frame/moulding.
Properly installed, the Metal Wedge
helps keep the Leverage Bar resting
on the door frame/moulding.
Before each exercise, always check
that the Leverage bar is resting on
the door frame/moulding.