Gnr Park-It Installation Manual Download Page 2

GNR Technologies, 2011

 

STEP 2: 

Drill ½” diameter pilot holes (3-4” in 
depth) 

through the product’s 

installation holes. 

 

STEP 3: 

Remove the product; re-drill the holes for the diameter and depth required 
by the metal shields. 

STEP 4: 

Install the metal shields, re-position the product and bolt with lag bolts. 

 

 
 

Maintenance: 

  Requires minimal maintenance. Periodically inspect the spikes / bolts and tighten 

if necessary. 

               

Reviews: