ENG
DAYLIGHT is now fully assembled.
We can finally plug the power cable into the wall socket. NOTICE: The lamp only comes on if the time has been set and is within the range sunrise-
sunset.
We recommend mounting the lamp at a minimum distance of 15 cm from the water surface. The Airlink WiFi Controller supplies the lamp with
low voltage and constant current via a 230V network cable and safety socket. The Controller must be positioned so as to be protected from
splashing water. The installation must be carried out under the tank surface, in a vertical position, with the connectors (IN DC and OUT) facing
downwards. This improves the performance of the driver modules and their durability. It must be fixed to the wall or to the cabinet through special
fixing holes. It is forbidden to place it near any sump or any other device for the treatment of the water in the tank. The AirLink WiFi Controller and
the power supply are not watertight appliances. It is absolutely forbidden to cover or insert the power supply and the AirLink WiFi Controller in too
cramped (unventilated) compartments, so as not to compromise their correct cooling.
7. SYNCHRONIZING TWO DAYLIGHT
The AirLink WiFi Controller is equipped with a Sync socket that allows you to connect two or more modules together and synchronize the lamps
accordingly. To synchronize the modules, disconnect the power plug from the wall outlet.
Move the AirLink Master rotary selector to position (0) and the AirLink Slave rotary selector to position (1), insert the Sync Cable into the respecti-
ve RJ connectors (in Sync and out Sync).
At this point you can reattach the power cable and connect to the AirLink Master.
Summary of Contents for DayLight
Page 1: ...IT DayLight Aquarium LED lighting system ...
Page 2: ...Designed and manufactured in Italy by GNC S r l ...
Page 13: ...IT SCHEMA CABLAGGIO CON ACCESSORIO POWERMOON SCHEMA CABLAGGIO SINCRONIZZAZIONE MASTER SLAVE ...
Page 25: ...ENG WIRING DIAGRAM WITH POWERMOON ACCESSORY MASTER SLAVE SYNCHRONIZATION WIRING DIAGRAM ...
Page 37: ...DE SCHALTPLAN MIT POWERMOON ZUBEHÖR MASTER SLAVE SYNCHRONISIERUNGS SCHALTPLAN ...
Page 51: ...Designed and manufactured in Italy by GNC S r l ...
Page 52: ...Designed and manufactured in Italy by GNC S r l ...