
Page 15
General Machine Products
(KT), LLC
Fit the cable through the machine.
Pass the cable through the in
-
feed guide, through the gap
between the drive rollers. Continue to feed the cable
through the cable seal into the airbox and into the duct.
Tighten the clamping screw until the pressure indicator is at
the halfway mark. Some cables may require less clamping
due to their size or construction. The amount of compression
required will become clear as more experience is gained with
the machine.
See appendix 2 for more information.
The cable is now positioned in the machine.
Back off the clamping
screw turning CCW far
enough to fit the cable
between the rollers.
Tighten the airbox chamber/duct
clamping screw.
Pressure Indicator