GMB Güstrower GTU 21 Manual Download Page 9

 

 
4.3 Maintenance 
 
Before maintenance work at the coupled trailer the engine of the carrier vehicle has to be 
switched off and the ignition key to be pulled out. If the engine has to be started during 
checks and inspections, special caution is to be exercised. 
When working under the jacked transfer vehicle, the vehicle needs to be secured with 
appropriate stands. 
Maintenance work at the brake and hydraulic system may only be done by trained 
professionals under observance of the security advices. 
 
The following maintenance works need to be executed daily:  
 

  check tyre pressure  

 

Caution! 
 

tyre pressures see Point 5.2. “Weights” 
 

  drain water from compressed air supply tank 

  check brake system and parking brake on their function 

  check electric system on its function 

  grease shaft 

  check hydraulic system for any damage 

  check drive chain tension 

   

 
The following maintenance works need to be executed after 50 operating hours:  
 

  check and adjust the actuation distance of the brake cylinder 

  grease every greasing spots as written in the greasing plan 

  check auger wear 

  check wheel bearings 

  check if every screw connection is solidly fixed, especially the towing eye 

 
The following maintenance works need to be executed after 100 operating hours:  
 

  check wheel nuts on fastening torque 

       

thread 

    Fastening torque in Nm at bolt performance 

 

 

 

8.8. 

10.9. 

12.9. 

M18 x 1,5 

290 

320 

350 

M20 x 1,5 

380 

420 

460 

M22 x 1,5 

510 

560 

610 

 

  check entire compressed air system on function, density and secure fixing 

  clear line filter of the braking pipes 

  clear wheel hub bearing 

 
The following maintenance works need to be executed after 200 operating hours:  
 

  Grease every greasing spot as written in the greasing plan.  

 

During care and maintenance work leaking oils and grease substances have to be caught 
with the proper tools and be disposed environmentally compatible. 

Summary of Contents for GTU 21

Page 1: ...Manual Transfer Vehicles Chaser Bin GTU 21 GTU 25 GTU 32 GMB Güstrower Maschinenbau GmbH Glasewitzer Chaussee 30 Tel 493843 2175 0 D 18273 Güstrow Fax 493843 2175 175 info gmb guestrower de Stand 07 2006 ...

Page 2: ...cle 7 4 Care and maintenance 8 4 1 Measures of care 8 4 2 Cleaning and greasing 8 4 2 1 Lubricants 8 4 2 2 Greasing plan 8 4 3 Maintenance 9 5 Technical data 10 5 1 Deviation 10 5 2 Weights 10 6 Equipment 12 6 1 Rolling tarpaulin 12 6 2 Installation to fill sowing machine or fertilizer spreader and Hydraulically controlled screw to fill sowing machine or fertilizer spreader 12 6 3 Working searchli...

Page 3: ...of the manual the MuA Landtechnik GmbH Co KG will assume no liability and guarantee 1 Intended use The transfer vehicle is a working device for transporting and transferring of crop free flowing fertilizer and seed as usually used in the agriculture Any further use is not intended therefore the user has to bear the risk To the intended use also belongs the observance of the care and maintenance co...

Page 4: ...transfer vehicle need to be secured against rolling 16 The door under the horizontal auger is to be closed before the machine is activated 17 The cleaning points at the bottom of the vertical auger always need to be closed before the machine is activated 18 In the range of the entire hydraulic system exists the danger to be injured by pressurised leaking hydraulic oil Damaged or defect parts of th...

Page 5: ... crushing during operation No riders during work and transport Keep sufficient distance from electric overhead wires especially with open unloading auger install sign in driving cab Do not stand in operating range of moving parts Never reach in the turning augers While operating do not open or remove protection equipment 5 ...

Page 6: ...Adjust the braking power regulator check brake and lights Connect hydraulic couplings and shaft Check that the speed of the unloading auger opening is restricted to provide a smooth slow and controlled movement for both opening and closing by adjusting the tractor spool valve The hydraulic slide need to work on the most conveniently controlled spool valve on the tractor as this stops the flow of m...

Page 7: ...point The vehicle can now be loaded again 3 2 1 Interrupt of the transfer process When interrupting the transfer process the same steps have to be proceeded as after the end of the transfer process Caution When interrupting the unloading process make sure that at first the slides are closed and then the augers are shut off to avoid a start up of the augers under full load If the unloading auger is...

Page 8: ... the transfer vehicle has to be opened Horizontal auger door beneath the screw hydraulic slide Emptying auger cleaning doors below the screw 4 2 1 Lubricants For greasing the trailer only the lubricants with the following described characteristics may be used lubricant sort quality oil transmission oil SAE 90 EP API GL 5 grease Li grease DIN 51502 KP 2K 4 2 2 Greasing plan The following grease spo...

Page 9: ...check drive chain tension The following maintenance works need to be executed after 50 operating hours check and adjust the actuation distance of the brake cylinder grease every greasing spots as written in the greasing plan check auger wear check wheel bearings check if every screw connection is solidly fixed especially the towing eye The following maintenance works need to be executed after 100 ...

Page 10: ...6500 9300 stabilising load empty 910 940 1000 1140 1700 all data in kg Caution Devises with a weighing system and other equipment differ from the weights given in the table Binding for the transport on public streets are the declarations in the TÜV report The over all weights and payloads on public streets refer to the respective wheel with a tyre pressure of 1 5 bar The tyre pressures for the tec...

Page 11: ...ls BKT 650 65 30 5 16 TL allowed over all weight on public streets 22000 kg payload on public streets 15200 kg technical payload at 2 2 bar 25 km h 17500 kg technical payload at 2 2 bar 40 km h 17500 kg Wheels Alliance 750 60 R30 5 181D allowed over all weight on public streets 22500 kg payload on public streets 15100 kg technical payload at 1 7 bar 25 km h 17500 kg technical payload at 1 7 bar 40...

Page 12: ... sessions The working light is powered from the tail lights of the bin a switch to turn on the searchlight is located on the junction box at the front of the transfer vehicle The searchlight is turnable and pivoted and may be adjusted individually While driving on public streets the working searchlights may not be switched on 6 4 Camera system The camera system allows the driver to monitor the tra...

Reviews: