Glow-worm Swift flow 100 Installation Instructions Download Page 3

3

Digital  Clock / Timer

221062A

Diagram 3

100 ILLUSTRATED

Diagram 2

3910

100 ILLUSTRATED

CLOCK/TIMER
MOUNTING
BRACKET

FASCIA
SECURING
SCREWS

3887

CONTROL
HOUSING
COVER
SECURING
SCREWS (2)

3909

CONTROL
HOUSING
COVER
SECURING
SCREW

Diagram 1

100 ILLUSTRATED

FASCIA
SECURING
SCREWS (2)

CONTROL
HOUSING
COVER

Diagram 4

CONTROL
HOUSING
SECURING
SCREW

*

4 WAY
TERMINAL
BLOCK

*Remove yellow link

Y2

Y1

N

L

B BR

Y Y

BR

B

Y

Y

5346

continuation of “Boiler Fixing”

Remove two of the fascia securing screws,
see diagram 1.

Remove the control housing securing screw and cover,
see diagram 1.

Fit the clock/timer bracket and loosely secure with the
two previously removed fascia securing screws, see
diagram 2.

Remove the control housing securing screws,
see diagram 3.

Secure the control housing to the frame with one of these
screws, see diagram 4.

Remove the four way terminal block from the top left
hand side of the control box, see diagram 4.

Fit the clock/timer to the bracket, see diagram 5.

Route wiring harness through the keyhole slot in the side
of the control box, insert the “snap in” cable bush and
connect to the clock/timer and four way terminal block
connector, see diagram 6.

Remove the clock/timer blanking plate from the outer
case and use the new blanking plugs supplied.

Stick the casing label, from the loose items pack, to the
right hand side of the clock/timer.

Note.  Some adjustment of the clock/timer bracket may
be required to allow for a satisfactory alignment of the
outer casing.

Now continue with “Boiler Fixing”, as described in the
Installation Instructions.

Reviews: