
0020107233_00 - 06/11 - Glow-worm
INSTALLATION
- 8 -
Diagram 2.1
13751
Diagram 2.2
13205
2 boiler Dimensions & Hydraulic
Schematic
All dimensions are given in millimetres (except as noted).
The general arrangement of the boiler is shown in diagram
2.1. and the hydraulic and gas schematic, diagram 2.2.
The data label is positioned on the front of the inner casing
panel.
Summary of Contents for 12 hxi G.C.No. 41-019-01
Page 14: ...0020107233_00 06 11 Glow worm INSTALLATION 14 12342 Diagram 5 1...
Page 21: ...0020107233_00 06 11 Glow worm INSTALLATION 21 Diagram 8 3 13000...
Page 32: ...0020107233_00 06 11 Glow worm MAINTENANCE 32 Diagram 12 4 13456...
Page 33: ...0020107233_00 06 11 Glow worm MAINTENANCE 33 13012 Diagram 12 5 CENTRAL HEATING...
Page 34: ...0020107233_00 06 11 Glow worm MAINTENANCE 34 13508 Diagram 12 6 Fault Codes...
Page 45: ...0020107233_00 06 11 Glow worm MAINTENANCE 45...
Page 46: ...a...