background image

17

0020004886A

12561

Fig. 13

FAULT B

7  Fault Finding

12560

Fig. 12

FAULT A

Summary of Contents for 115-150-175-200-250-300

Page 1: ...563 Unvented hot water storage cylinders 115 150 175 200 250 300 Glow worm Nottingham Road Belper Derbyshire DE56 1JT www glow worm co uk To b e l e f t w i t h t h e u s e r Instructions for Use Inst...

Page 2: ...st with low interest rates PRICE MATCH always get the best deals available Boilers Radiators Heating controls Pipes ittings Cylinders Fires Renewable energy Bathroom suites Kitchen sinks taps Showers...

Page 3: ...cylinder in your home Glow worm appliances are manufactured to the very highest standard so we are pleased to offer our customers a Comprehensive Guarantee We recommend you complete and return your G...

Page 4: ...4 1 1 DHW Temperature Control 4 1 2 CH Control 4 1 3 Immersion Heater 4 1 4 Applications 4 1 5 Typical applications 4 1a Technical Data 4 2 Instructions for use 6 2 1 Introduction 6 2 2 Liability 6 2...

Page 5: ...in a decorative casing They are supplied with all necessary cold and hot water controls and a 2 port valve for control of domestic hot water TheGlow wormcylindersoperateusingamainswaterpressure supply...

Page 6: ...ating pressure 3 5 bar Pressure reducing valve 3 5 bar Expansion relief valve 6 0 bar T P valve 95 7 0 C bar Net weight 28 30 33 39 44 49 kg Weight full 145 175 205 245 310 340 kg Height 969 1179 1339...

Page 7: ...details 2 1 Introduction YourGlow wormunventedhotwatercylinderandboiler together provide you with a modern efficient high performance heating and hot water system Because your Glow worm hot water cyli...

Page 8: ...nstalled by a competent person to the prevailing standards installation book and building regulations at the time of installation 4 The benchmark log book must be completed on installation and kept up...

Page 9: ...return valve E Pressure limiting valve 3 5 bar incorporating a line strainer Check that the cylinder has been supplied with the following Packed inside cylinder carton Water control pack pressure redu...

Page 10: ...f the tundish see fig 6 The discharge pipework must be installed using minimum 22 mm copper pipework from the 1 inch BSP female connection on the tundish to a safe and visible discharge point There mu...

Page 11: ...ination shown in fig 8a is satisfactory Examples of points to consider when deciding whether a location for the high level discharge is suitable are 1 The possibility taking into account wind effect t...

Page 12: ...11 0020004886A 4 Installation Fig 5 4 3 FUNCTIONAL DIAGRAM 12553 Fig 6 4 3 FUNCTIONAL DIAGRAM 12554...

Page 13: ...by either i Screwing the vessel directly into the control assembly at the purpose provided connection 1 fig 8 or ii Connecting the vessel to the control assembly via copper pipe or a suitable approve...

Page 14: ...der and accompanying boiler may be controlled using various programmers and room thermostats details of which are given in section Control Options The Glow worm cylinder has a prefitted cylinder therm...

Page 15: ...5 3 Control options system wiring scheme IMPORTANT 1 10 must go to the corresponding number in the wiring centre 4 Installation Fig 10 2x2 PORT VALVE SYSTEM 12558 This valve is required even if a 3 p...

Page 16: ...15 0020004886A Fig 11 CONNECTION DETAILS BETWEEN PROGRAMMER AND WIRING CENTRE 4 Installation 12559...

Page 17: ...ns supplied with the boiler Upon completion of the commissioning procedures set the DHW thermostat knob on the Glow worm cylinder to setting 5 6 approx 60 C and set the back up immersion heater fig 9...

Page 18: ...17 0020004886A 12561 Fig 13 FAULT B 7 Fault Finding 12560 Fig 12 FAULT A...

Page 19: ...18 0020004886A 7 Fault Finding 12564 Fig 14 FAULT C...

Page 20: ...19 0020004886A 7 Fault Finding 12562 Fig 15 FAULT D...

Page 21: ...20 0020004886A Because of our constant endeavour for improvement details may vary slightly from those shown in these instructions...

Reviews: