1
4
3
2
Installation Instructions
Before installation or servicing, turn off and disconnect from main power supply.
To achive IP67, neoprene cable and IP connector have to be used during installation.
Dismantle luminaire from the recess housing. Cover the recess housing with the lid
provided.
Once the cement has set, remove the lid from the recess housing. Undo screws and
remove stainless steel plate from the luminaire.
Ensure trim is flush to 3mm above ground to prevent water from accumulating on
luminaire surface.
1
2
3
4
INSTALLATION MANUAL
www.glos.com.sg
1
OFF
ON 2
1
OFF
ON 2
2
3
1
Concrete
Note:Ensure concrete does
not exceed the recess housing
2
1
MAX
3MM
NG
OK
5
6
AC 220-240V
(green/yellow)
L(brown)
N(blue)
2
1
3
4
Feed appropriate wire through conduit and into housing of in-ground light fixture. The
wiring should be appriopriate for safe burial and long life in the ground.
5
The housing can be adjusted 1-4mm by tightening or loosening the screw to level with
ground.
6
Establish proper grounding to ensure safety. Confirm depth requirements with a
licensed electrician and dig a hole deep enough to hold the concrete and luminaire in
place. The diameter of the hole should be 15cm greater than the diameter of the fixture.
Fill gravel at the bottom to allow appriopriate drainage from the recess housing and fill
remaining volume with cement for stability. Ensure concrete does not exceed the recess
housing.
To adjust the angle of the luminaire, remove components accordingly as shown on
Fig 7. Light up luminaire to allow evaporation and fix components back in place
7
Ensure luminaire and bezel is firmly tighten to ensure water resistance. Restore
power.
8
7
8
30°
2
3
1