background image

6.

  7.  Let the vibrator head penetrate to the bottom of the layer as quickly as
    possible under its own weight. 
  8.  Keep the vibrator head vertical to minimize voids and enhance the release of  
    entrapped air. For shallow flat slabs, lay the vibrator head horizontally and  
    drag it through the concrete.
  9.  Withdraw the vibrator head slowly. Be sure concrete fills in behind leaving 
    no hole. Do not attempt to “stir” the concrete.
10.  Use repeated placements of the vibrator in a systematic pattern to be sure the  
    entire surface has been vibrated. The area of action can be observed by noting  
    how far from the vibrator head bubbles appear on the surface. Placements of  
    the head should insure overlapping of the areas of action.
11.   When compacting concrete placed on a previously compacted layer, push the  
    vibrator 4-6” into the lower layer. Move the vibrator  up & down for 5-15
    seconds to “knit” the two layers together.
12.  Avoid placing the concrete in “heaps”. If it is necessary to flatten a heap,  
    insert the vibrator head around the perimeter of the heap using as many place- 
    ments as necessary.
 13.  Consolidation is complete when no new bubbles come to the top, a glistening  
    layer of mortar covers the concrete surface, and the “whine” of the motor
    indicates that the vibrator speed has leveled

 off.

 14.  Clean all vibrator parts immediately following each use.

IV. Motor Maintenance

Routine monthly maintenance is recommended unless the power unit is used for multiple 
shifts per day or in harsh environments (heavy dust, snow, sand, etc.). Refer to the Robin 
Engine Owner’s Manual provided with your VMG-1750BP for details on performing engine 
maintenance.
  1. 

Engine Oil

 

(SAE10W-30, API SJ):

 Check before each use. Change after the 

    first 10 hours of use and every 50 hours there after. Change every 25 hours in  
    high ambient temperatures.

  2.  Air Filter:

 Check before each use. Clean every 25 hours or more frequently    

    if used in dusty areas.
 

3.  Spark Plug: 

Clean and adjust gap every 25 hours. Replace every two years.

  4. 

Quick Disconnect:

 Require no lubrication and no routine maintenance. To order  

    additional quick disconnect drive fittings or for other replacement parts, contact your  
    dealer or Global Manufacturing at 1-800-551-3569. 

                                                                  

                     

                                                                                       

DO NOT place anything on top of the motor.
DO NOT stand on the backpack frame or engine.

ALWAYS store the unit with its engine upright and the base on a flat level surface.
Do not store the unit on its side.  Oil or gasoline may leak as a result.  Leaking oil or gaso-

line is toxic and a fire hazard.
For long-term storage, it is recommended that the gasoline tank be drained and the engine 

operated until the remaining fuel is consumed.

CAUTION

Summary of Contents for Viber Mini Backpack

Page 1: ...tes Little Rock Arkansas 72202 501 374 7416 TEL 800 551 3569 TOLL FREE USA CANADA www globalmanufacturing com www viber vibrators com Viber Mini Backpack Operating Instructions INTERNAL CONCRETE VIBRATOR PORTABLE GASOLINE POWERED BACKPACK VMG 1750BP ...

Page 2: ...on following the key word very carefully DANGER WARNING Not obeying the instructions followed by these signal words may lead to death or injury of the operator or those around him CAUTION Not obeying the instructions following this signal can lead to personal injury or damage to the equipment Before you use the VMG 1750BP please read through the entire set of operating instructions and the Robin o...

Page 3: ...E HEAD Smart PartsTM SYSTEM You build the right Smart PartsTM System for your application by choosing from the wide range of Viber components including nine different power options fourteen different flexible drives and twenty different vibrator heads These components all use identical fittings so that Viber components are completely interchangeable Any flexible drive can be used with any of the p...

Page 4: ...he black knob points outward FAST is at the top and STOP is at the bottom All Viber system components are interchangeable All flexible drives cores and casings can be used to attach any head to any power unit For optimum perfor mance and wear consult your Smart Parts SYSTEM GUIDE or the table in SECTION VI for the best combination of components 1 Attach the flexible drive casing with lubricated co...

Page 5: ...flon tape to the casing threads then tighten the head in a clockwise direction Use a crescent wrench on the machined flats on the head and channel locks or a small pipe wrench on the casing fitting to make sure the connection is secure 5 Use only fresh unleaded gasoline with a pump octane rating of 86 or higher Do not over fill tank III Operation 3 Do NOT leave out the Teflon tape It is required t...

Page 6: ...ough to allow the operator to put on the unit easily after starting 8 Pump the fuel bulb on the carburetor to ensure fuel is in the float bowl 9 For a cold engine move the choke lever to the CLOSED position To restart a warm engine leave the choke lever in the OPEN position 10 Turn the red engine ignition switch to the ON position 11 Place the throttle lever in the SLOW position 12 Hold the VMG 17...

Page 7: ...e the throttle lever to the SLOW fully down position and turn off Stop Switch Follow the guidelines below when using your Viber Internal Concrete Vibrator for consolidating concrete 1 DO NOT leave the vibrator running in air Totally submerse the vibrator head in the concrete This cools the bearings Running the vibrator in air without regularly submersing it in the concrete will overheat the bearin...

Page 8: ...f the motor indicates that the vibrator speed has leveled off 14 Clean all vibrator parts immediately following each use IV Motor Maintenance Routine monthly maintenance is recommended unless the power unit is used for multiple shifts per day or in harsh environments heavy dust snow sand etc Refer to the Robin Engine Owner s Manual provided with your VMG 1750BP for details on performing engine mai...

Page 9: ...V Parts List 7 Part Part Description ...

Page 10: ...te in thin walls columns beams precast piles thin slabs and along construction joints 3 5 3 5 x 3 5 1 1 2 VH 24 1 3 4 VH 28 PH Polly Head General Use Plastic stiff plastic con crete in general construction such as walls columns beams pre stressed piles and heavy slabs 2 4 3 75 x 3 75 1 3 4 VH 28 2 VH 32 PH Polly Head Shallow Pours Plastic stiff plastic con crete in slabs and other shallow pours le...

Page 11: ...nded 7 or longer recommended 7 or longer recommended 4 Select the power unit desired from column 4 VMG 1750BP is a 1 6 hp backpack mounted gasoline engine Electric and pneumatic power units are also available 5 Find the core and casing length desired in section 5 A small diameter 7 8 casing is available in all sizes for use with the 7 8 head Note 28 and 35 flex drives require coupling two shorter ...

Page 12: ...0 allowing the flexible drive to more easily push back behind the operator as it is pulled from the concrete Motor remains tight so it does not move excessively as the operator changes positions The Engine will operate in any position VIII Troubleshooting Call factory 1 800 551 3569 Engine 4 cycle 2 04 cu in 1 6 hp Robin Overhead Valve Engine Fuel Standard Unleaded Gasoline 86 octane or higher 0 1...

Reviews: