ASSEMBLY OF HEAVY-DUTY HIGH CAPACITY SHELVING
Two people are recommended for assembly. Approximate assembly time: 35-45 minutes per section.
The reference numbers used throughout this sheet refer to the illustration on the back cover.
This is to help you to identify the various parts as they are mentioned.
4.
Lay the bottom shelf decking (Ref. No. 5) on the shelf supports
so that the front and back edges overlap the front and back
shelf supports.
1.
With help from an associate, or using a wall for support,
create a unit end by connecting two SUR uprights together
(Ref. No. 1) with two front-to-back end shelf supports (Ref.
No. 2), one at the top and one at the bottom. Be sure the
supports are fully seated in the slots. Repeat to construct a
second unit end.
2.
Next, connect the two unit ends with two LRA left-to-right
shelf supports (Ref. No. 3), temporarily leaving off one of the
top left-to-right supports.
NOTE: It is important that one top left-to-right support be
temporarily left off in order to later insert the upper shelves.
3.
Attach one front-to-back center shelf supports (Ref. No. 4) by
inserting the deck support keyhole slots over the rivets on the
supports and tapping them firmly into place.
IMPORTANT!
All shelf
supports should be
inserted with the
return flange on top,
as shown at right.
(This flange is what the
shelves will rest upon)
NOTE: Inset is shown
from opposite side.
NOTE: One left-to-right
support is not inserted
until step 8.