background image

ASSEMBLY OF HEAVY-DUTY HIGH CAPACITY SHELVING

Two people are recommended for assembly. Approximate assembly time: 35-45 minutes per section.

The reference numbers used throughout this sheet refer to the illustration on the back cover.  

This is to help you to identify the various parts as they are mentioned.

4.

 

Lay the bottom shelf decking (Ref. No. 5) on the shelf supports  

 

so that the front and back edges overlap the front and back  

 

shelf supports.

1.

 

With help from an associate, or using a wall for support,    

 

create a unit end by connecting two SUR uprights together  

 

(Ref. No. 1) with two front-to-back end shelf supports (Ref.  

 

No. 2), one at the top and one at the bottom. Be sure the   

 

supports are fully seated in the slots. Repeat to construct a  

 

second unit end.

2.

 

Next, connect the two unit ends with two LRA left-to-right  

 

shelf supports (Ref. No. 3), temporarily leaving off one of the  

 

top left-to-right supports. 

NOTE: It is important that one top left-to-right support be  

temporarily left off in order to later insert the upper shelves.

3.

 

Attach one front-to-back center shelf supports (Ref. No. 4) by  

 

inserting the deck support keyhole slots over the rivets on the  

 

supports and tapping them firmly into place.

IMPORTANT!

 

All shelf  

supports should be  
inserted with the  
return flange on top,  
as shown at right.  
(This flange is what the  
shelves will rest upon)

NOTE: Inset is shown 

from opposite side.

NOTE: One left-to-right 

support is not inserted 

until step 8.

Summary of Contents for RXHS-361872

Page 1: ...FUTURE REFERENCE RETAIN INSTRUCTIONS FOR FUTURE REFERENCE ASSEMBLY INSTRUCTIONS PARTS MANUAL Heavy Duty Reinforced High Capacity Shelving 36 Wide 46 Wide 60 Wide Units Global Industrial 111 Harbor Park Dr Port Washington NY 11050 800 645 1232 service globalindustrial com GENERAL SAFETY INFORMATION GENERAL SAFETY INFORMATION Some parts may have sharp edges CARE must be taken when handling various p...

Page 2: ... No 2 one at the top and one at the bottom Be sure the supports are fully seated in the slots Repeat to construct a second unit end 2 Next connect the two unit ends with two LRA left to right shelf supports Ref No 3 temporarily leaving off one of the top left to right supports NOTE It is important that one top left to right support be temporarily left off in order to later insert the upper shelves...

Page 3: ...front and rear of each shelf This requires two bolts per shelf 7 Attach the remaining shelf supports and decking at the desired shelf levels completing one level at a time NOTE Once all but the top shelf are in place attach the remaining left to right shelf support at the top level 8 After attaching the top decking and securing it with two sets of bolts your die rack unit is fully assembled and re...

Page 4: ... for replacement purposes REF REF NO DESCRIPTION NO DESCRIPTION 1 Heavy Upright Post 4 SUR hh SUR hh SUR hh SUR hh SUR hh 2 Front to Back End Shelf Support 10 LRA 18 LRA 24 LRA 18 LRA 24 LRA 24 3 Left to Right Shelf Support 10 LRA 36 LRA 36 LRA 48 LRA 48 LRA 60 4 Front to Back Center Shelf Support 10 SDS 18 SDS 24 SDS 18 SDS 24 SDS 24 5 Steel Decking 5 ZS 3618 ZS 3624 ZS 4818 ZS 4824 ZS 6024 6 1 4...

Reviews: