background image

Page 7

INSTALLATION

TORRENT INDIRECT - OPEN VENTED HEATINg SYSTEm (FIgURE 4)

The open vented primary system is filled via the feed and expansion cistern supplied.  
It is therefore important that the unit is positioned at the highest point in the system.  
Ensuring  that  the  minimum  head  for  the  boiler  and  system  pump  is  as  required 
by the boiler manufacturers.

1)  If the flow and return pipes between the boiler and Torrent - Indirect store are 
  dipped  then  the  boiler  selected  must  be  suitable  for  use  in  a  sealed  heating 
  system i.e. it must be fitted with an overheat thermostat (Figure 4).

)  Any  boiler  can  be  used  with Torrent-  Indirect  provided  the  flow  pipe  from  the 
  boiler to the Torrent is continuously rising.  (Figure 5)

3)  The  flow  pipe  between  the  boiler  and  the Torrent  thermal  store  is  part  of 
  the open vent and therefore it must not be fitted with any isolating valve, non-
  return valve or any other component which can obstruct the flow.

4)  The minimum size of flow and return pipes between the boiler and the Torrent 
  should be mm copper or equivalent.

5)  Where  the  radiators  are  to  be  fitted  higher  than  the  Torrent,  then,  the 
  feed  and  expansion  cistern  can  be  sited    at  higher  level    but  a  maximum  6m 
  from the base of the  Torrent.  The water level must be at least 50mm higher 
  than the highest radiator  in the system.  (Figure 5)

6)  The  installer  must  fit  the  feed  and  vent  pipes  pipes  ensuring  continuous 
  rise on the open vent and no isolating valves in either open vent  or cold feed 
  pipes.  A combined feed and vent pipe shold not be used with Torrent.

7)  The installer must fit the close coupled open vent and cold feed pipes for heating 

circuit as shown schematically in Figures 4 and 5.

8)  The primary thermal store and the heating systems are filled from the same feed 

and expansion cistern.

9)  It is important to ensure that both   the primary store and the system  are fitted  
  and vented before switching on the boiler and the immersion heater if fitted.

10)The  water  level  must  be  set  correctly  by 

adjusting the ballvalve in the F & E cistern.  
A  mm  connection  is  provided  for  the 
overflow/warning  pipe,  which  should  be 
no less than 0mm internal diameter and 
have a continuous fall.

11)This  should  be  fitted  to  discharge  clear 

of  the  building  and  be  situated  so  that 
any overflow can be easily observed.  The 
warning pipe should be installed in either 
high  temperature  uPVC  or  copper  and 
should not have any other connections to it.
Alternatively the Torrent thermal store can 
be filled by a temporary connection without 
the use of a ball valve or requirement for an 
overflow/warning pipe.

ImPORTANT:

 Care must be taken to ensure 

the  unit  is  filled  to  the  correct  water  level 
when  using  a  temporary  connection.  It  is 
also  important  to  ensure  the  unit  does  not 
onverflow when filling.

TORRENT  INDIRECT  -  SEALED  HEATINg  
SYSTEm  (FIgURE 6)

1.    Only  boilers  suitable  for  sealed  system 
  must be used in this configuration and a 
  typical arrangement is shown in Figure 6.

.  The  feed  and  expansion  cistern  may 
  be  sited  above  the Torrent  in  the  same 
  cupboard.

3.  The F & E cistern on sealed heating system 
  only  fills  the  thermal  store.   Therefore 
  the  provision  must  be  made  for  filling 
  the  primary  radiator/boiler  circuit  by 
  incorporating  approved  filling  loop  and 
  method.

4.  The  water  level  must  be  set  correctly  in 

the  F  &  E  cistern  when  filling  manually 
or  by  adjusting  the  ballvalve.      A  mm 
connection  is  provided  for  the  overflow/
warning  pipe,  which  should  be  no  less 
than 0mm internal diameter and have a 
continuous fall.

5.  This should be fitted to discharge clear 
of  the  building  and  be  situated  so  that 
any overflow can be easily observed.  The 
warning pipe should be installed in either 
high  temperature  uPVC  or  copper  and 
should  not  have  any  other  connections 
to it.

6.  It  is  important  to  ensure  that  both 
primary store and the system are fitted and 
vented before switching on the boiler and 
the immersion heater if fitted.

Figure 4 Boiler with dipped flow and return

Boiler suitable for

sealed system 

applications

Boiler

Auto

Air Vent

Boiler manufacturers minimum

head requirements must be 

adhered to.

Highest point of system

50mm min.

Summary of Contents for Torrent T144 DE

Page 1: ...ins pressure hot water supply incorporating a thermal store Design Installation Instructions All models comply with the WMA specification for thermal stores Please leave these instructions adjacent to the appliance ...

Page 2: ...upply domestic is at mains pressure it is not necessary to fit an expansion chamber pressure or temperature relief valve This information is provided to assist generally in the selection of equipment Responsibility for selection and specification of our equipment must however remain that of our customer and any experts or consultants concerned with the installation s PLEASE NOTE THAT WE DO NOT THE...

Page 3: ...easy to incorporate into the building and will not sufferfromtheproblemsassociatedwithusing PVCu soil stacks to take the discharge from unvented cylinders TORRENT DIRECT Figure 1 Torrent Direct is an electrically heated fully packagedmainspressurehotwaterappliance It is a combination unit which incorporates a feed and expansion tank and eliminates the problems associated with a cold water cistern ...

Page 4: ...pre set thermostat from your Local Gledhill Depot Figure 1 Torrent Direct torrent direct This is a thermal store directly heated by electric immersion heater The feed and expansion cistern is included in the finished case with the feed and vent pipe factory supplied and connected Adjustable thermostatic mixing valve To hot taps showers mm Cold mains feed mm Immersion heater Off Peak Immersion heat...

Page 5: ...the system is designed to operate with priority to domestic hot water i e full divert then no additional allowance for hot water is required for sizing the boiler r e t a W t o H c i t s e m o D r o f e c n a w o l l A l e d o m W k r e t a W t o H c i t s e m o D r o f e c n a w o l l A e d o m t r e v i D l l u F e d o m e r a h S w o l F 0 3 1 T 0 0 7 1 T 0 3 0 0 T 0 5 3 Adjustable thermostatic...

Page 6: ...he thermal store the feed and expansion cistern on these two appliances systems can be filled manually if required ie through a hose pipe fitted with a double check valve In this situation an overflow can still be fitted if required to ensure that if a leak occurs on the internal coils it can be discharged safely to the outside of the building and not discharge internally from the feed and TYPICAL...

Page 7: ...0 The water level must be set correctly by adjusting the ballvalve in the F E cistern A 22mm connection is provided for the overflow warning pipe which should be no less than 20mm internal diameter and have a continuous fall 11 This should be fitted to discharge clear of the building and be situated so that any overflow can be easily observed The warning pipe should be installed in either high tem...

Page 8: ...tors are fitted above the level of the unit F E tank water level must be 50mm min above the highest point in the primary system The boiler manufacturers instructions with regard to minimum head must be followed Feed and Vent pipes to be fitted by installer Maximum Height 6M Min 50mm All heating returns must be connected prior to primary return from the coil ...

Page 9: ...lling loop and gauge Note F E tank on sealed system only required to fill Thermal store Primary radiator system filled from mains All heating returns must be connected prior to primary return from the coil The pressure relief valve should be fitted as close as practical to the boiler The expansion vessel should be sized in the normal way ...

Page 10: ... cleanser such as Fernox Superfloc or Sentinel X300 to ensure that flux residues and installation debris are removed from the system When determining the quantity of cleanser required on open vented systems be sure to allow for the increased volume of water in the primary circuit due to the thermal store Commission the boiler If the boiler is range rated then adjust to the specified design heat in...

Page 11: ...s set to maximum for all boilers DO Ensure that the water level in the expansion cistern is at least 250mm above the highest point on the radiator circuit and satisfies the boiler head required DO Insulate any exposed pipework in the Torrent cupboard DO Plumb the overflow warning pipe in 20mm minimum internal diameter tubing to discharge in a conspicuous external position using high temperature uP...

Page 12: ...ight on the BSP male connectors to the adaptor 13 Loosen the filling cap on the Decalomat 3 to allow carbon dioxide formed in the descaling process to escape 14 Plug the Decalomat 3 to a 240V 50Hz electric supply The pump in the Decalomat will now circulate the coloured descaling solution through the heat exchanger coil of the Torrent Depending on the degree of scale formation within the coil the ...

Page 13: ... Supplied adaptor From secondary coil Descaler reservoir Pump Descaling on site saves time and money Safe and easy to use Ensures optimum system efficiency Prolongs life of heat exchange coil Adjustable thermostatic mixing valve To hot taps showers 22mm Cold mains feed 22mm Immersion heater optional Primary Coil ...

Page 14: ...Aquaflow Regulators Ltd Haywood House 40 New Road Stourbridge West Midlands DY8 1PA Telephone 01384 442611 Fax 01384 442612 WATER SAVINGS OPTIONS FOR SHOWERS 4 FIXING OPTIONS FOR TAPS MIXERS 1 MK Range Combined Regulators Aerator for screwing onto Taps Mixers with internal or external threads on their noses Anti Vandal models also available 2 MR05 T Range Internal Regulators Push fit into TaporMix...

Page 15: ... set too low Is the boiler output at least 10 more than the rad loading Does the boiler flow reach temperature Is the boiler thermostat adjustable Correct Torrent thermostat setting set to 75ºC Report to the boiler manufacturer Adjust to maximum Descaling required Is heat exchanger scaled up internally Indicated by reduction of flow rate Alter pipe sizes Does the temp rise across the boiler exceed...

Page 16: ...l a B 7 0 T F 5 0 5 0 7 3 t a o l F e v l a v l l a B 9 4 T F 6 0 5 0 7 3 3 a w a r B e v l a V g n i x i M 7 0 0 C X 7 8 5 8 3 4 e v l a v g n i x i m r o f t e k s a g g n i r e r a p S 8 0 0 C X 7 0 5 0 7 3 5 W k 3 r e t a e h n o i s r e m m I 8 7 0 B X 4 8 1 9 3 E 6 t a t s o m r e h T l o r t n o C 0 1 0 C X 7 8 9 ...

Page 17: ...and Tanks The copper storage vessel is guaranteed for ten years and if it proves to be defective either in materials or workmanship we will either repair or supply replacement at our option with the closest substitute in the case of any obsolete product to any address in Great Britain i free of all charge during the first year after delivery by us ii thereafter at a charge of one tenth of the then...

Page 18: ...his contract ii all other goods the subject to of any other contract between the Purchaser and us which at the time of payment of the full price of the goods sold under this contract have been delivered to the Purchaser but not paid for in full c until property in the goods supplied hereunder passes to the Purchaser in accordance with paragraph 2 above i the Purchaser shall hold the goods in a fid...

Page 19: ...Page 19 notes ...

Page 20: ......

Reviews: