gledhill PCA 200 - SOL Addendum Manual Download Page 4

Page 4

10 mm dry pocket fitted with
Capillary Thermostat
set at 87   C  cutoff

o

SOLAR PUMP
CONTROLLED
 OUTPUT

L

N

E

Solar Circuit Pump

Complete Solar Kit supplied and fitted by Installer.
The Pulsacoil Solar appliance is supplied with the following additional items:-

1. 

15mm copper Solar Collector pipe connection

2. 

22mm copper Solar Return pipe Connection

3. 

Capillary Thermostat, Store Over Heat Interlock Device

4. 

Two wiring terminals for installer to connect interlock cable. “SL-SP”

5. 

10mm diameter dry pocket for solar control sensor

6. 

High Temperature Armaflex Class ‘0’ foam insulation for solar 

 

exposed internal pipe work.

3rd Party Typical Solar Kit Arrangement

Gledhill ‘A’ Class Pulsacoil Sol

80.5  C

o

This Diagram must be used in conjunction with the full ’A’ Class 
Pulsacoil wiring diagram on pages 16 & 17 of the Design, 
Installation and Servicing Instruction Manual.
The extra wiring terminals shown above are not shown in the base 
manual and have been illustrated above for ease of understanding, 
Their actual location is on the far right hand side of the din rail 
within the appliance situated  above the top immersion heater,
see photo below for actual din rail postion.

T1

T2

T3

Additional wiring
terminals for installer
to connect 3rd party
solar pump interlock

It is the responsibility of the installer to 
follow all best practices for solar plumbing 
connections, support for this will need to be
sought from the solar kit supplier.

10mm dry pocket provided
for 3rd party solar controller 
sensor to be inserted

Solar Collector

Solar Return

Schematic arrangement of extra wiring required for solar appliance 

(including high temperature interlock) 

SL-SP

SL-SP

COTHERM
GTLH0054
SET TO MAX
87  C

o

Br Bl G/Y

Br

Bl

G/Y

L N

E

Installer solar interlock connection
terminals labelled “SL-SP” , they are
none polarized and are volt free 
contacts rated at  250 VAC 10 Amps 

1.0 design

1.2 tecHnical data

Summary of Contents for PCA 200 - SOL

Page 1: ...liance with thermal store designed specifically for use with solar energy these instructions must be read in conjunction with the standard PULSACOIL design installation and servicing instructions before installation TM benchmark Thecodeofpracticefortheinstallation commissioning servicingofcentralheatingsystems Models PCA 200 SOL PCA 220 SOL PCA 240 SOL PulsaCoil SOL A C L A S S ...

Page 2: ...06 CORGI operates a Self Certification Scheme for gas heating appliances These arrangements represent a change from the situation whereby compliance with the Building Regulations was accepted if the Benchmark Logbook was completed and this was then left on site with the customer With the introduction of a self certification scheme the Benchmark Logbook is being replaced by a similar document in th...

Page 3: ...eak tariff it is recommended that a time clock is fitted on the electrical supply to the off peak bottom immersion heater This should be set to charge the store overnight and allow the solar to replenish the store during the day A new appliance incorporating most of the solar equipment and controls will be available later this year The controls will be intelligent and under certain conditions will...

Page 4: ...ng Instruction Manual The extra wiring terminals shown above are not shown in the base manual and have been illustrated above for ease of understanding Their actual location is on the far right hand side of the din rail within the appliance situated above the top immersion heater see photo below for actual din rail postion T1 T2 T3 Additional wiring terminals for installer to connect 3rd party sol...

Page 5: ...ge Volumes Total litres 164 191 210 Solar litres 53 64 68 Heat loss factor kWh 24h 2 022 2 052 2 086 Temperature factor vessel heat loss 1 This flow rate is based on a 35ºC temperature rise and assumes that the recommended pressures and adequate flow are available at the appliance The actual maximum flow rate is regulated to a maximum of 26 litres minute 2 The temperature of hot water is also regu...

Page 6: ... and all relevant codes of practice and regulations in force at the time of installation That all necessary inlet controls and safety valves have been fitted correctly It has only been used for the storage of potable water supplied from the public mains Where appropriate the unit has been regularly maintained as detailed in the installation and service instructions 1 Domestic and Commercial Open V...

Page 7: ...ciated with a fiduciary relationship shall apply d the Purchaser s right to possess the goods shall cease forthwith upon the happening of any of the following events namely i if the Purchaser fails to make payment in full for the goods within the time stipulated in clause 4 hereof ii if the Purchaser not being a company commits any act of bankruptcy makes a proposal to his or her creditors for a c...

Page 8: ......

Reviews: