background image

3

Stop Switch

 – Momentary push button to stop the  

motor.

Direction Switch

 – Momentary (spring loaded) switch. 

After setting the desired shear rate, moving the switch 

in the desired direction will initiate movement. This 

switch will then become inactive until the stop button is 

pressed, or a limit switch is activated. The left position 

will move the water chamber to the left. It will continue 

until the water chamber activates the limit switch. At 

this time, the limit indicator light will be lit. The right 

switch position will move the shear box to the right until 

the home limit switch is made. See above note…

Home & Limit Indicators

 – Used to indicate the limit 

of travel of the shear box.

Fuse

 – 4 amp SLO BLO fuse located in the cabinet 

rear.

 

OPERATING INSTRUCTIONS

Read all operating instructions before performing a test 

and refer to ASTM D3080 or AASHTO T 236 for com-

plete test procedures and calculations.

Set Up

1.  Place the shear box into the water chamber and se-

cure the load cell shaft to the top of the shear box.

2.  Tighten the two shear ring clamping knobs located 

on the left side of the water chamber.

3.  Install the counterbalance, Model HMA-739, if nec-

essary. 

4.  Tare the load cell by pressing the “Tare” button on 

the digital readout.  

5.  Adjust the top cross arm and dial gauge so there is 

1/8in gap between the cross arm and loading ball. 

Align the cross arm pin so it is above the loading 

ball.  Make sure the cross arm is level.

6.  Adjust the dial gauge by raising or lowering the in-

dicator rod and holder so the tip of the dial gauge is 

resting on the cross arm pin.   

Consolidation

1.  Select a seating load with the load setting calibration 

chart.  Set the HIGH LOAD or LOW LOAD knob to 

LOW  and the Load Valve to “LOAD.” 

2.  Adjust the Fairchild Pressure Regulator to the de-

sired seating load per the load setting calibration 

chart, this value is displayed on the bottom digital 

readout.  

3.   Turn the “LOAD” knob to “OFF” and adjust the Pres-

sure Regulator to the desired normal load based 

on the load calibration chart.  If reading from the 

“LOW” calibration chart keep the knob on the LOW 

LOAD position.  If reading from the “HIGH” calibra-

tion chart, turn the knob to “HIGH LOAD”

4.  Read the dial indicator to note the initial reading.  
5.   Turn the Load Valve to “LOAD” to begin consolida-

tion.  

Direct Shear

1.  After consolidation phase is complete, add a small 

seating shear load by adjusting the two knurled nuts 

on the load cell support.

2. Adjust or zero the horizontal dial indicator.
3.  Remove the two holding screws on the shear box 

to separate the top and bottom sections.  Adjust the 

four adjusting screws on the shear box to set the 

gap between the top and bottom of the shear box.  

One full turn of these adjusting screws will give a 

0.031in (0.78mm) gap.  

4.  Set the shear/strain rate with the thumbwheels on 

the left side of the machine.  Each number is set by 

pushing the thumbwheel button, the rate is in inches 

per minute (0001 = 0.0001 in/min).

5.  To begin shear, switch the DIRECTION toggle switch 

to the left towards the LIMIT light.  Record shear 

readings at the prescribed intervals. 

6.  The water chamber with shear box will continue to 

move at the set rate until the limit switch is activated 

or the STOP button is pressed.  

7.  At the test completion, switch the DIRECTION tog-

gle to the right towards the HOME light.  Press the 

stop button when Zero load is reached on the load 

cell readout.  

7A.  If Residual Shear values are needed, these can be 

determined during this time.

8.   Reduce the vertical load to Zero by adjusting the 

Fairchild Pressure Regulator until Zero psi is 

reached on the pressure readout.

9.   The Shear Box can now be removed from the water 

chamber and the sample can be inspected. 

 

 

 

 

Reviews: