![Gill 330155 Assembly Instructions Manual Download Page 3](http://html1.mh-extra.com/html/gill/330155/330155_assembly-instructions-manual_2227399003.webp)
5"
INST330175
www.gillathletics.com
Page 3 of 8
800-637-3090
12/12/2017
All rights reserved.
BASEBALL/SOFTBALL BATTING TUNNELS
Copyright
H
2016 by Gill Athletics.
ASSEMBLY INSTRUCTIONS
ROPE00119
ROPE00120
DETAIL D
HDWE57041
ROPE00120
NOTE:
To form a loop use 2 rope
clips, 1 thimble, and a
minimum 5" cable turn back
2.
After all poles are set in place and footers have cured, main
tension cables can be installed as shown below. Enough cable
(one continuous piece) will be provided to complete entire setup.
Measure out all cable before making cuts.
One side (top and bottom) will attach with a shackle
See DETAIL C
The other side (top and bottom) will attach with a turnbuckle
See DETAIL D
Single cage: 4 main tension cables (2 top @ 2 bottom)
Double cage: 6 main tension cables (3 top @ 3 bottom)
Tripple cage: 8 main tension cables (4 top @ 4 bottom)
ROPE00120
ROPE00120
DETAIL C
PULY00101
ROPE00119
Main Tension Cable