9
Model: OVH-10-C
2-04.1.
Electrical Connections
1.
Install appropriate circuit breaker in Main breaker box.
2. Remove Hood Back Panel.
3. Connect appropriately sized wire
(supplied by customer)
from breaker box to Hood. Allow sufficient
cord length to allow moving hood, if necessary, for future service or maintenance.
4. Connect Hood and Appliance wiring to Hood terminal blocks. Several different wiring configuration
options are possible depending on specific installation situations and appliance choices. See
Section
2-04.2
for specific details of these options.
5. Replace all panels and covers.
6. Turn on Main Breaker.
7.
Place the Hood Power Switch in the
ON
position; Hood fan will start. For
ILS
model hood, press and
hold the “Push to Start” button on the Control Panel for approximately 5 seconds to start fan.
•
All electrical installation should be performed by a
qualified electrician or technician.
•
Improper installation or poor work practices could result in serious injury or even death, damage to
equipment or property, and void the warranty.
•
If using a remote contactor
(Section 2-04.2.4)
, the contactor must be a UL Listed, definite purpose
AC resistive air heating type, suitable for the appliance load. Installation and connections shall be in
accordance with the National Electric Code NFPA 70.
Model: OVH-10-C
Summary of Contents for OVH-10-C
Page 2: ......
Page 4: ......
Page 26: ...Model OVH 10 C Overview 16 3 01 Control Panel 2 1 ILS Only 7 6 5 3 9 4 8 ...
Page 28: ...18 Model OVH 10 C Overview 3 02 Hood Front Filter Chamber 1 4 3 2 5 6 Not Shown ...
Page 32: ...22 Model OVH 10 C Overview NOTES ...
Page 40: ...Operation Filter Maintenance Model OVH 10 C 30 NOTES ...
Page 44: ...34 Model OVH 10 C Hood Cleaning Maintenance Notes ...
Page 52: ...NOTES Parts List Model OVH 10 C 42 ...
Page 53: ......