
- Prepare the fitting surface using the recommen-
ded product applying a thin layer after degreasing
the surface with a suitable solvent (e.g. trichloro-
ethylene)
Recommended products
Loctite 510
Liquid sealant
Gasket
- Assemble the equipment need to close the crank-
case half (screws, wrench).
- Heat the crankcase half on the flywheel side us-
ing the thermal gun, with the same procedure on
the transmission side crankcase half.
- Keep the transmission side crankcase half in hor-
izontal position to introduce the flywheel side
crankcase half with a firm and precise move.
N.B.
WEAR GLOVES WHEN HANDLING THE
CRANKCASE HALF. DO NOT USE RAGS FOR
THIS OPERATION
.
- Insert at least 3 fixing screws and tighten quickly.
- Insert 5 more screws and tighten at the prescribed torque.
Locking torques (N*m)
Crankcase closing screws:
12 -13 Nm
- Move the crankcase separation plate in a position
back from the one indicated in the figure
- Install the special magnetic support with dial
gauge at the end of the crankshaft
- Check the axial clearance of the crankcase
If this is not within the maximum limit allowed, re-
peat the crankcase coupling procedure
Specific tooling
020335Y
Magnetic support for dial gauge
Engine
Runner RST Purejet
ENG - 34
Summary of Contents for Runner RST Purejet
Page 1: ...MANUALE STAZIONE DI SERVIZIO 633600 633607 Runner RST Purejet ...
Page 4: ......
Page 6: ......
Page 7: ...INDEX OF TOPICS CHARACTERISTICS CHAR ...
Page 18: ...Characteristics Runner RST Purejet CHAR 12 ...
Page 19: ...INDEX OF TOPICS TOOLING TOOL ...
Page 31: ...INDEX OF TOPICS MAINTENANCE MAIN ...
Page 40: ...Maintenance Runner RST Purejet MAIN 10 ...
Page 41: ...INDEX OF TOPICS TROUBLESHOOTING TROUBL ...
Page 45: ...INDEX OF TOPICS ELECTRICAL SYSTEM ELE SYS ...
Page 61: ...INDEX OF TOPICS ENGINE FROM VEHICLE ENG VE ...
Page 67: ...INDEX OF TOPICS ENGINE ENG ...
Page 106: ...Engine Runner RST Purejet ENG 40 ...
Page 107: ...INDEX OF TOPICS SUSPENSIONS SUSP ...
Page 112: ...Stand screw torque 18 5 to 19 Nm Suspensions Runner RST Purejet SUSP 6 ...
Page 113: ...INDEX OF TOPICS PURE JET INJECTION INJ PJ ...
Page 174: ...pure jet injection Runner RST Purejet INJ PJ 62 ...
Page 175: ...INDEX OF TOPICS BRAKING SYSTEM BRAK SYS ...
Page 183: ...INDEX OF TOPICS COOLING SYSTEM COOL SYS ...
Page 189: ...INDEX OF TOPICS CHASSIS CHAS ...
Page 201: ...Runner RST Purejet Chassis CHAS 13 ...
Page 202: ...Chassis Runner RST Purejet CHAS 14 ...
Page 203: ...INDEX OF TOPICS PRE DELIVERY PRE DE ...
Page 207: ...INDEX OF TOPICS TIME TIME ...