![Gilbarco K94555-01 Installation Instructions Download Page 4](http://html1.mh-extra.com/html/gilbarco/k94555-01/k94555-01_installation-instructions_2227113004.webp)
Installation
© 1999 Gilbarco, Inc. • 7300 West Friendly Avenue • Post Office Box 22087 • Greensboro, North Carolina 27420 • Phone (336) 547-5000 • http://www.gilbarco.com
MDE- 3584C
08/99
Printed in the U.S.A.
Installing New Membrane Switch
1
Open Side A main access door. See MDE-2531 for instructions.
2
Remove switch backing bracket by removing all 3/8" screws. Discard 3/8" screws.
Note: Note the position where each screw is removed. Use these same mounting holes to
install new screws in step 4.
3
Remove existing membrane switches. Replace with new membrane switches.
4
Reinstall switch backing bracket using new 7/16" screws.
5
Repeat procedure for Side B.
6
Close and lock main access door(s).
7
Restore power. See MDE-2531 for instructions.
8
Test each grade select button for correct operation. See MDE-2531 for more information.
Backing bracket (see below)
3/8" screws – replace with
new 7/16" screws in same
mounting positions (see
below)
Membrane switch –
replace with new switch
Install 8 screws in alternating
positions (36" frame):
Install 10 screws in alternating
positions (48" frame):
Backing bracket