MDE-3116E Distribution Box PA0306 Installation Instructions · November 2015
Page 17
Appendix: Rewiring Transformer for Smaller Sites
2
Remove one secondary connection from the top of the transformer and move that secondary
connection to the contact from where the loop-back was removed in step
(see
).
Figure 7: Moving Secondary Connection
3
Remove the loop-back connection and discard it (see
Figure 8: Removing Loop-back Connection
Returning Transformer to Service
To return the transformer to service, proceeds as follows:
1
Reinstall the transformer onto its studs and reassemble the transformer shield and D-Box
board tray.
2
Reinstall the AC power cord to the D-Box.
3
Plug the AC cord back into the isolated and dedicated receptacle.
4
Remove the lockout/tagout tags.