background image

Gigaset N720 SPK PRO / LUG ALL en / A31008-XXXXX-XXXX-X-XX / Cover_front.fm / 3/20/20

V

e

rsio

n 2,

 06

.0

8.

201

0 / M

o

d

u

leV

e

rs

io

n 1.

0

N720 SPK PRO

Multicell System

Site Planning Kit

Summary of Contents for N720 SPK PRO

Page 1: ...Gigaset N720 SPK PRO LUG ALL en A31008 XXXXX XXXX X XX Cover_front fm 3 20 20 Version 2 06 08 2010 ModuleVersion 1 0 N720 SPK PRO Multicell System Site Planning Kit ...

Page 2: ...rking with the Gigaset N720 SPK PRO 4 Checking the package contents 4 Further recommended accessories 5 Before you begin 5 Setting up the measuring base station 6 Starting up the measuring handset 10 Operating the measuring handset 12 Customer service and help 16 Questions and answers 16 Environment 16 Appendix 17 Approval 17 Care 17 Contact with liquid 17 Technical details 18 Index 20 ...

Page 3: ...s in environments with a potential explosion hazard e g paint shops The devices are not splashproof For this reason do not install them in a damp environment such as bathrooms or shower rooms Use only the power adapter indicated on the device Whilst charging the power socket must be easily accessible Remove faulty devices from use or have them repaired by our Service team as these could inter fere...

Page 4: ...ies for exact determination of the DECT environmental conditions for the planned network and is delivered in a case You can use the measuring devices in the case to determine the DECT wirelesscoverageatyourlocation establishhowmanybasestationsare required and their optimum location and find sources of interferences in the wireless network Checking the package contents Detailed information on plann...

Page 5: ...charging time in the charger is approx 5 hours Stand To obtain an exact measurement we recommend that you mount the measuring base station and battery carrier securely on a stand The base carrier is fitted with a thread connection for this purpose This enables you to simulate the installation of a base station at every possible height and check the layout and range of the network Thestand should h...

Page 6: ...rier Remove the base carrier from the case together with the measuring base station and battery pack Slide the lid to the left to open the battery compartment Lift the lid gently with your fingernail to get past the lock on the right edge Plug the connector on the battery pack cable onto the two pins on the left side of the battery compartment Note The connector is shaped so that it can only be at...

Page 7: ...ging position by sliding it towards the charging socket Plug the battery charger into a mains socket You may need to attach the appropri ate plug in module first Plug the battery charger plug into the charging socket on the back of the base carrier Chargethebatteriesuntilthecharger s charging indicator lights up When the batteries are charged unplug the charger plug from the charging socket and re...

Page 8: ...th power via the battery pack inserted in the battery carrier Alternatively you can also use one of the following power supplies Unplug the power cable plug from the base station Connecting to the mains power supply Connect the cable for the power adapter provided to the power connection on the measuring base station Use the power adapter provided no in the figure on P 4 Plug the power adapter int...

Page 9: ...ion on the stand Connecting to a switch with PoE functionality Power over Ethernet Connect the LAN socket on the measuring base station to a connection on an Ethernet switch Use a shielded Ethernet cable 1 2 1 2 Thebasecarrierisfittedwithabracketformounting the measuring base station on a stand Position the thread of the battery carrier on the stand and screw the battery carrier into place ...

Page 10: ... spares The display and keypad are protected by plastic film please remove it 1 2 3 4 5 Connecttheflatplugofthe poweradapter to the charger Insert the power adapter into a mains socket If you have to remove the plug from the charger cradle again Press the release button and disconnect the plug 1 2 3 1 2 3 Insert the batteries with the polarity in the correct direction The polarity is indicated in ...

Page 11: ...Charge the handset in the charger for 5 hours After charging remove the handset from the charger and only replace it when the batteries are fully discharged The handset may only be placed in the associated charging cradle Lights up white Charged over 66 Lights up white Charged between 34 and 66 Lights up white Charged between 11 and 33 Lights up red Less than 11 charged Flashes red Battery almost ...

Page 12: ...ement Guide This section only describes the functions of the handsets relevant for measurements For information on the standard functions of the Gigaset S650H PRO handset see the user guide for the device See the product page at gigasetpro com Values for determining the connection quality RSSI value RSSI value Base station signal reception strength with the best reception in dBm Acceptable value 2...

Page 13: ...otesttheconnection to a measuring base station from a measuring handset Enter the number string from the keypad Press the talk key The test melody is played via the loudspeaker If you have connected a headset press the speaker key to hear the melody Activating deactivating the measuring handset The measuring handset is activated automatically when it is placed in the charger This means that it is ...

Page 14: ...te it via the service menu Proceed as follows Press and hold the off key to deactivate the handset Press and at the same time and hold them down Then press and hold the on key The handset is now in Service mode Enter the five digit service PIN On delivery this is 76200 The service menu is opened Select the Metering Mode entry with the navigation key Change Press the display key to activate the ent...

Page 15: ...trength as a per centage value This represents the signal strength of the pack age received as a ratio of the maximum possible RSSI 100 Use the navigation key to select the desired display of the signal strength dBm The signal strength measured is displayed in dBm This is preset and is the recommended mode The signal strength measured is displayed as a percentage of the maximum possible RSSI SEN N...

Page 16: ...t to the international standards ISO 14001 and ISO 9001 ISO 14001 Environment Certified since September 2007 by TÜV SÜD Management Service GmbH ISO 9001 Quality Certified since 17 02 1994 by TÜV SÜD Management Service GmbH Disposal All electrical and electronic products should be disposed of separately from the municipal waste stream via designated collection facilities appointed by the government...

Page 17: ... com docs This declaration could also be available in the International Declarations of Conformity or European Declarations of Conformity files Therefore please check all of these files Care Wipe the device with a damp cloth or an antistatic cloth Do not use solvents or microfibre cloths Never use a dry cloth this can cause static In rare cases contact with chemical substances can cause changes to...

Page 18: ... NiMH Size AAA Micro HR03 Voltage 1 2 V Capacity 700 mAh Capacity 2000 mAh Usage time 5 8 hours Charging time in charger 3 hours Manufacturer Salom Electric Xiamen Co Ltd Commercial registration number 91350200612003878C 31 Building Huli Industrial District Xiamen Fujiam361006 P R China Salcomp Shenzen Co Ltd Commercial registration number 91440300618932635P Salcomp Road Furond Industrial Area Xin...

Page 19: ...o Ltd Commercial registration number 91440300618932635P Salcomp Road Furond Industrial Area Xinqiao Shajing Baoan District Shenzen 518125 China Model identifier EU C705 UK C710 Input voltage 230 V Input AC frequency 50 Hz Output voltage 4 V Output current 0 15 A Output power 0 6 W Average active efficiency 46 Efficiency at low load 10 not relevant only at output power 10 W No load power consumptio...

Page 20: ...ible 3 Environment 16 19 F Frame quality 12 G Gigaset N720 SPK Site Planning Kit 4 H Handsfree mode 13 Headset connect 11 L Liquid 17 Looking after the phone 16 M Measurement interval 15 Measuring base station LED 7 mounting on the stand 9 setting up 6 Measuring base station power supply via battery pack 7 via mains power supply 8 via PoE 9 Measuring equipment 4 Measuring handset accessories 10 ac...

Page 21: ...itSIX fm 3 20 20 Version 2 06 08 2010 ModuleVersion 1 0 S Safety precautions 3 Service menu 14 Service mode 14 Signal strength 12 change unit of measure 15 Slot pair 12 Stand 5 mounting 9 T Time slot 12 Troubleshooting 16 All rights reserved Rights of modification reserved ...

Page 22: ... Cover_back fm 3 20 20 Version 2 06 08 2010 ModuleVersion 1 0 Issued by Gigaset Communications GmbH Frankenstr 2a 46395 Bocholt Germany Gigaset Communications GmbH 2020 Subject to availability All rights reserved Rights of modification reserved www gigaset com ...

Reviews: