- 11 -
Hardware Installation
6. Install CPU before installing the Liquid cooling module.
NOTE!
•
The CPU cooling block has pre-applied thermal paste, so no need to apply additional paste
unless reseating the cooler.
•
Make sure all DIMM slot latches are all in a locked position.
7. Hold the liquid cooling module acrylic protector horizontally and remove it from the package box.
Summary of Contents for H262-ZL0
Page 1: ...Liquid Cooling Module for H262 ZL2 and H262 ZL0 User Guide Rev 1 0 ...
Page 4: ... 4 This page intentionally left blank ...
Page 7: ... 7 Hardware Installation Server System Packing Box Accessory Box Support Brackets and Screws ...
Page 10: ...Hardware Installation 10 5 Secure the support brackets with screws ...