System Installation Guide
3-8
(Fig-15)
(2.) SR-202
:
a. Facing the back-side of system, insert the Air Flow Duct
diagonally
(
Fig-19
)。
b. On the other side of Air Flow Duct, follow the above
instruction again.
(
Fig-20
)。
c.
Finally, completely insert the Power Cable and header
inside the Air Flow Duct to ensure the heat flow out
smoothly.
Attention:
There are pressure from both front and back
end, therefore the slight pop up at middle is nature.
Fig-16
Fig-17
Fig-18