background image

GS-SR222 System Installation Guide 

18 

  

 

Figure 20 

 

 

Figure 21 

Step 7. 

Put the PCI raiser bracket into the server system. (Fig-20)  

Step 8.

 Securing the bracket with tighten the raiser card firming 

screw. (Fig-21)

 

 

5.6. Air 

Flow 

Duct Installation 

GS-SR222 is enhanced a new device which called Airflow Duct. 

The main function of the airflow duct is to increase the capability 

of driving out the excessive system heat (Especially the CPU 

heat). In order to maintain the system operating smoothly, please 

note that the 

CPU 

and 

Memory 

are installed in advance. 

Remember to install the airflow duct back to into the system to 

ensure the consistency of system operation. 

 

To install the airflow duct properly, please take the following steps: 

Step 1. 

There are two holes on locate on the system module. 

(Fig-22)

 

There are two stable racks on the airflow duct.  

Summary of Contents for GS-SR 222

Page 1: ...GS SR 222 Rack Mount Server System Installation Guide ...

Page 2: ......

Page 3: ...NK INSTALLATION 14 5 4 MEMORY INSTALLATION 15 5 5 PCI EXPANSION CARD INSTALLATION 15 5 6 AIR FLOW DUCT INSTALLATION 18 5 7 REINSTALL TOP COVER 20 5 8 SCSI ID SETTING 21 5 9 DOCK HANDLE INSTALLATION 23 5 10 HARD DISK DRIVE INSTALLATION 23 5 11 APPEARANCE OF GS SR222 25 5 11 1 FRONT VIEW OF GS SR222 25 5 11 2 REAR VIEW OF GS SR222 25 5 11 3 LED INDICATOR DESCRIPTION 26 5 12 DUAL LAN CARD INSTALLATIO...

Page 4: ...hor assumes no responsibility for any errors or omissions that may appear in this document nor does the author make a commitment to update the information contained herein Third party brands and names are the property of their respective owners ...

Page 5: ... electrical grounding type plug only fits into a grounding type power outlet This is a safety feature The equipment grounding should be in accordance with local and national electrical codes The equipment operates safely when it is used in accordance with its marked electrical ratings and product usage instructions Do not use this product near water or a heat source Set up the product on a stable ...

Page 6: ... shock from lightning To reduce the risk of fire use only No 26 AWG or larger telecommunications line cord Do not plug a modem or telephone cable into the network interface controller NIC receptacle Disconnect the modem cable before opening a product enclosure touching or installing internal components or touching an uninsulated modem cable or jack Do not use a telephone line to report a gas leak ...

Page 7: ...not cause harmful interference and 2 this device must accept any interference received including interference that may cause undesired operation FCC part 68 applicable to products fitted with USA modems The modem complies with Part 68 of the FCC Rules On this equipment is a label that contains among other information the FCC registration number and Ringer Equivalence Number REN for this equipment ...

Page 8: ... certification means that the equipment meets certain telecommunications network protective operational and safety requirements The Department does not guarantee the equipment will operate to the user satisfaction Before installing this equipment users ensure that it is permissible to be connected to the facilities of the local Telecommunications Company The equipment must also be installed using ...

Page 9: ...ppropriate electric inspection authority or electrician as appropriate NOTICE The Load Number LN assigned to each terminal device denotes the percentage of the total load to be connected to a telephone loop which is used by the device to prevent overloading The termination on a loop may consist of any combination of devices subject only to the requirement that the sum of the Load Numbers of all th...

Page 10: ...tain for future reference The procedures in this guidebook assume that you are a system or network administrator experienced in installing similar hardware The user s guide is organized as follows Chapter 3 Introduction provides the basic product information and the key features of the product Chapter 4 Contents Package lists the essential hardware installation components Chapter 5 System Installa...

Page 11: ...the following tips Go through the installation guide carefully before starting the system installation processes Keep the system away from static and magnetic field Do not apply any cleaning solutions directly to the system 3 1 Features The Gigabyte GS SR222 is a rack optimized server that offers superior performance and scalability to your networking system It contains the several features that p...

Page 12: ...upport 12GB Register DDR memory on 6 DDR sockets Integrated SCSI Controller Adaptec 7899w dual channel SCSI controller 160MB s date transfer rate Integrated Intel Network Adapter Features Dual Intel 82544GC Gigabit Controllers Supports PxE WOL AFT ALB GEC FEC Intelligent Management System Standard supports IPMI v 1 0 for system monitoring Hot Swap Hard Disk Drive Bays 6 SCSI Ultra 160 320 Hot Swap...

Page 13: ... Form Factor 2U Rack optimized design I O expansion slots 2 full length 64 bit 100 MHz PCI slots 1 low profile 32bit 33 MHz PCI slots Power supply 460W maximum continuous required power Operating temperature 41 to 95 degrees F 5 to 35 degrees C ...

Page 14: ... If any component is missing or damaged in the system please contact your vendor immediately Component Content List Chassis Power Supply Installed 8IPXDR Motherboard Installed Slim type CD ROM drive Installed Slim type Floppy drive Installed Six Hard Disk Drive Trays Two CPU heat sinks Two Dock Handle with two tow screws Driver and Application CD System Installation Guidebook GA 8IPXDR Motherboard...

Page 15: ...e system when installing 5 1 Chassis Removal Step 1 Unscrew the two thumbscrews from the back of the system Fig 1 Figure 1 Figure 2 Step 2 Standing at the front of the system Gently apply force to the indentures with your thumbs and push toward the rear of the chassis for about 3 4 of an inch Top cover may be lifted straight up Fig 2 ...

Page 16: ...mory Rise up the airflow duct as the clip circle shown in the picture Fig 3 Step 4 Install CPU and other essential components Figure 3 5 2 CPU Installation Step 1 Please make sure the CPU type and speed that are supported by the motherboard Step 2 To Install the CPU s lift up the bar that located next to the socket Fig 4 Figure 4 ...

Page 17: ...The noticed corner should point toward the end of lever The CPU will only fit in the orientation as shown Fig 5 Figure 5 Step 4 Then align the CPU insert it into the socket Fig 6 Push the lever back to the original position Fig 7 Figure 6 Figure 7 ...

Page 18: ...modules Seat the heat sink firmly in the retention modules with the two cooler brackets Step 3 First hook one end of the cooler bracket to the CPU socket as shown in the Fig 8 Make sure the middle part of bracket is push into the desired position Fig 9 Step 5 Hook the other end of the cooler bracket by gripping it to another side of retention module Fig 10 Figure 10 ...

Page 19: ...emory modules into the DIMM sockets Fig 11 to12 Figure 11 Figure 12 5 5 PCI Expansion Card Installation GS SR222 provides expansion riser slots for two peripheral cards 64Bit 66 MHz full height To install the peripheral please go through the following steps Step 1 There are three screws holding the riser bracket First remove the screw on the top of the bracket then remove another two screws locate...

Page 20: ...GS SR222 System Installation Guide 16 Figure 13 Figure 14 Step 2 Then unscrew the raiser card firming screw as the stable clip circle pointed Fig 16 Figure 15 Figure 16 ...

Page 21: ... card into place There are two standoff copper pillars to hold the raiser card Secure the card with screw Make sure it is seated properly into PCI slot Step 5 Replace the riser bracket into the PCI slot on the motherboard Fig 18 Figure 18 Figure 19 Step 6 Push down the bracket firmly The card is seated properly into PCI slot Fig 19 ...

Page 22: ... the airflow duct is to increase the capability of driving out the excessive system heat Especially the CPU heat In order to maintain the system operating smoothly please note that the CPU and Memory are installed in advance Remember to install the airflow duct back to into the system to ensure the consistency of system operation To install the airflow duct properly please take the following steps...

Page 23: ...airflow duct ensuring the two stable racks are inserted correctly into the system module Fig 23 After inserting the airflow duct please pay attention to the table clip circle shown in Figure 24 Make sure the airflow duct is firmly inserted in the airflow stable rack Figure 24 ...

Page 24: ...ould be completely placed under the duct cover Otherwise the upper case might not be able to close tightly 5 7 Reinstall Top Cover When complete the installation of the entire essential components from subsection 5 1 to 5 6 replace the plastic air duct This will secure the airflow is inside the chassis Failure to do so may cause CPU and Memory over heating Replace top cover insuring that the thumb...

Page 25: ...Guide 21 5 8 SCSI ID Setting The SCSI ID is shown in Figure 27 If there occurs an abnormal SCSI hard disk drive behavior e g does not detect the hard disk drive properly please make sure that the each HDD has different ID Figure 27 ...

Page 26: ... ON ON ON ON 1 ON ON ON OFF 2 ON ON OFF ON 3 ON ON OFF OFF 4 ON OFF ON ON 5 ON OFF ON OFF 6 ON OFF OFF ON 7 ON OFF OFF OFF 8 OFF ON ON ON 9 OFF ON ON OFF A OFF ON OFF ON B OFF ON OFF OFF C OFF OFF ON ON D OFF OFF ON OFF E OFF OFF OFF ON F OFF OFF OFF OFF ON Jumper Close 1 2 OFF Jumper Open 2 3 ...

Page 27: ...Put two on each side of the chassis secure with screws provided Fig 28 Figure 28 5 10 Hard Disk Drive Installation Step 1 Pull the hard disk drive tray handle and remove the tray from the chassis Fig 29 Insert the hard disk drive into the tray Secure each hard disk drive with screws Fig 30 Figure 29 Figure 30 ...

Page 28: ...de 24 Step 2 After securing the hard disk drive with the screws hold the hard drive handle at open position place the tray into chassis Fig 31 and push the hard disk drive tray handle to the closed position Fig 32 Figure 31 Figure 32 ...

Page 29: ...222 System Installation Guide 25 5 11 Appearance of GS SR222 5 11 1 Front View of GS SR222 5 11 2 Rear View of GS SR222 CD ROM Drive Floppy Drive USB LED 6 SCSI Hot Swap HDD Power Connectors Expansion Slots ...

Page 30: ...us On Green System power on Power LED Off N A System power off On Green LAN online Off N A LAN offline LAN LED Blink Green LAN acting On Amber Fan fail Fan LED Off N A Fan acting System LED N A N A No definition LAN 1 LED LAN 2 LED FAN Status LED System Status LED Power LED USB Connectors ...

Page 31: ... Off N A HDD idle Non RAID HDD LED 2 Blink Green HDD acting Non RAID HDD LED 1 Off N A No HDD installed RAID fail or Rebuild RAID HDD LED 1 On Green HDD installed RAID HDD LED 2 Off N A HDD idle RAID HDD LED 2 Blink Green HDD acting RAID HDD LED 2 On Amber RAID fail under OS or no HDD RAID HDD LED 2 Blink Amber HDD RAID rebuild or system booting RAID HDD LED 1 HDD LED 2 ...

Page 32: ...ese few steps Step 1 There are three screws holding the riser bracket First remove the screw on the top of the bracket Fig 33 then remove the two screws located at the rear Fig 34 Figure 33 Figure 34 Step 2 Then unscrew the raiser card firming screw as the stable clip circle pointed Fig 35 Figure 35 Figure 36 Step 3 Carefully pull up and remove the PCI riser bracket Fig 36 ...

Page 33: ...to place Fig 37 Figure 37 Figure 38 Step 5 Push down the bracket firmly The card is seated properly into PCI slot Fig 38 Figure 39 Figure 40 Step 6 Put the PCI raiser bracket into the server system Securing the bracket with tighten the raiser card firming screw Fig 39 to 40 ...

Page 34: ...GS SR222 System Installation Guide 30 5 13 Connector Icon Description Suggested icons Description Keyboard VGA Mouse LAN ParallelPort Serial Port USB ...