- 17 -
Hardw are Installation Process
English
5) IDE1/ IDE2 [IDE1 / IDE2 Connector(Primary/Secondary)]
Ø
Important Notice:
Please connect first harddisk to IDE1and
connect CDROM to IDE2.
The red stripe of the ribbon cable must be the
same side with the Pin1.
IDE1
IDE2
6) FDD (Floppy Connector)
Ø
Please connect the floppy drive ribbon cables
to FDD. It supports 360K,720K, 1.2M, 1.44M
and 2.88M bytes floppy disk types.
The red stripe of the ribbon cable must be the
same side with the Pin1.
1
1
1
7) RAM_LED
+
-
Ø
Do not remove memory modules while
DIMM LED is on. It might cause short or
other unexpected damages due to the 2.5V
stand by voltage. Remove memory modules
only when AC Power cord is disconnected.
Summary of Contents for GA-8SLML
Page 2: ......
Page 25: ...21 Hardware Installation Process English...
Page 26: ...22 GA 8SLML Series Motherboard English...
Page 52: ...48 GA 8SLML Series Motherboard English...
Page 58: ...54 GA 8SLML Series Motherboard English...
Page 60: ...56 GA 8SLML Series Motherboard English 5 5 Click Next 6 7 6 Click Finish to restart computer...