GP7170-4000  REPAIR INSTRUCTIONS

Preventative Maintenance Check-List & Recommended Spare Parts List

Check

Daily

Weekly

50hrs

Every

       Every

        Every

500 hrs

      1500 hrs

       3000 hrs

Oil Level/Quality

X

Oil Leaks

X

Water Leaks

X

Belts, Pulley

X

Plumbing

X

Recommended Spare Parts

Oil Change

X

     X

Plunger Spare Parts (1 kit/pump)

            X

(See page 5 for kit list)
Oil Seal Kit (1 kit/pump)

            X

(See page 5 for kit lit)

Valve Spare Parts (1 kit/pump)

            X

(See page 5 for kit list)

24) After removing the C-clip (33B), pry out seal adapter (33) with a screwdriver.
25) Check seals (32) and surfaces of plunger base (25).
26) Remove crankcase cover (4). Loosen inner hexagon screws (24A) on the connecting rods (24) and push con rod halves

as far into the crosshead guide as possible.

CAUTION: Connecting rods (24) are marked for identification. Do not twist connecting rod halves. Connecting

rod is to be reinstalled in the same position on crankshaft journals.

27) Check surfaces of the connecting rod (24) and crankshaft (22).
28) Take out bearing cover (14) to one side and push out crankshaft (22) taking particular care that the connecting rod (24)

doesn’t bend.

29) Reassemble in reverse order: Regulate axial bearing clearance - minimum 0.1mm, maximum 0.15mm-by means of fitting

disc (20A). The crankshaft (22) should turn easily with little clearance. Tighten inner hexagon screws (24A) to 30 ft.-lbs.

CAUTION: Connecting rod (24) has to be able to be slightly moved sidewise at the stroke journals.

30) Reassemble cover (4) and seal (5) onto crankcase (1). Fasten with hexagon screws (10).
31) Reinstall shim (33C), and seal adapter (33) with radial shaft seal (32), and o-ring (33A) onto crankcase (1).

CAUTION: Radial shaft seal (32) must always be installed so that the seal-lip on the inside diameter faces the oil.

32) Reinstall remainder of fluid end as described above.

GP7170-4000  TORQUE SPECIFICATIONS

Position

Item #

Description

Torque Amount (ft.-lbs.)

36C

07664

Plunger Tensioning Screw

26

49A*

13160

Nut

103

54

05250

Inner Hexagon Screw

155

*Important - Check torque bi-weekly on item 49A

Summary of Contents for GP7170-4000

Page 1: ...3 Exploded View page 4 Parts List Kits page 5 Repair Instructions pages 6 7 Torque Specifications page 7 Recommended Spare Parts List page 7 WarrantyInformation back page Triplex Ceramic Plunger Pump...

Page 2: ...olume or RPM A pressure relief device must be installed in the discharge of the system 3 Acids alkalines or abrasive fluids cannot be pumped unless approval in writing is obtained before operation fro...

Page 3: ...rating shown are the power require ments for the pump Gas engine power outputs must be approximately twice the pump power requirements shown above We recommend a 1 1 service factor be specified when s...

Page 4: ...Exploded View GP7170 4000 4...

Page 5: ...ripReturnRing 3 42 05238 O Ring 3 43 05239 Pressure Ring 3 44 05240 Sleeve 9 45 05241 Sleeve Support Ring 3 46 05071 Seal Tension Spring 3 47 05242 Seal Case 3 47A 06667 O Ring 6 48 05243 Discharge Ca...

Page 6: ...10mm socket wrench 13 By gripping hex flats separate plunger assembly 36 from crosshead 25 by means of two open end wrenches size 22mmand27mm CAUTION Do not loosen the 3 plunger bases 36A before the v...

Page 7: ...ournals 27 Check surfaces of the connecting rod 24 and crankshaft 22 28 Take out bearing cover 14 to one side and push out crankshaft 22 taking particular care that the connecting rod 24 doesn t bend...

Page 8: ...odifications made by the customer or third party 6 The operation of pumps and or accessories exceeding the specifications set forth in the Operations Manuals provided by Giant Industries Inc Liability...

Reviews: