background image

page 17 of 23

LAYLA OTTOMAN BED ASSEMBLY INSTRUCTIONS

2575

STEP 11

BOLTS SHOULD BE POSITIONED AT THE  CENTRE OF THE LONG HOLES

9

9

Parts
Required

OR RIGHT SIDE OPENING.

LEFT SIDE OPENING.

9.HINGE LEFT&

RIGHT X 2

17.HINGE'S SUPPORT

RAILS 

X 2

H X 1
G X 8

O X 8

N X 8

Summary of Contents for LAYLA OTTOMAN BED

Page 1: ...rious stages of construction Carefully open the pack supplied and check the contents against the parts and fittings check list Do not destroy any of the packaging until you are certain that you have a...

Page 2: ...e Check all screws or bolts are tightened and inspect regularly This product should only be used on firm level ground Dismantle for transportation Only use recommended accessories Tools are included W...

Page 3: ...product If any components are missing please contact your retailer The fittings pack contains small items that should be kept away fromsmall children 12 13 8 8 10 20 19 5 5 15 15 3 3 21 16 16 16 16 18...

Page 4: ...CS Description LEFT RAIL Carton NO 3 1 PC Description RIGHT RAIL Carton NO 3 1 PC Carton NO 3 1 PC Description BACK RAIL Carton NO 3 Qty 1 PC Description CENTRE RAIL Carton NO 2 Description WOODEN SLA...

Page 5: ...K L M N O P Q C D E F G 4MM Allen Key 5MM Allen Key Spanner J 10 44 44 47 47 10 20 30 40 50 60 70 80 90 100 LAYLA OTTOMAN BED ASSEMBLY INSTRUCTIONS 1 1 1 A B Not to scale Fixings to scale Ref Qty Dime...

Page 6: ...ottoman hinges All pistons are tested in the factory for correct pressure and operation before use Initially it might appear that the pistons are very stiff when opening and closing the ottoman frame...

Page 7: ...move When the ottoman is almost shut it will close completely under its own weight When lowering the slat unit for the first time take care to make sure it does not rub unevenly on the inside face of...

Page 8: ...page 8 of 23 2575 Do not attempt to move the bed whilst the frame is in the upright positon LAYLA OTTOMAN BED ASSEMBLY INSTRUCTIONS...

Page 9: ...page 9 of 23 2575 LAYLA OTTOMAN BED ASSEMBLY INSTRUCTIONS Layout Parts on Soft Surface Lay out all 4 sides on a soft surface i e Rug Carpet or Packaing Carton...

Page 10: ...AN BED ASSEMBLY INSTRUCTIONS STEP 1 Parts Required H G NO X 4 1 HEADBOARD X 1 2 FOOTBOARD X 1 7 STORAGE BASE SUPPORT X 4 H X 1 G X 8 N X 8 O X 8 X 4 I E M L 6 6 LEG X 4 I X 1 E X 4 L X 4 M X 4 STEP 2...

Page 11: ...SSEMBLY INSTRUCTIONS STEP 3 Parts Required I X 1 L X 8 M X 8 C X 8 STEP 4 Parts Required 3 X 2 21 LOWER MIDDLE RAILS X 1 H X 1 F X 4 N X 4 O X 4 21 3 2 3 3 2 1 1 Make sure the bed is square Note THEN...

Page 12: ...STRUCTIONS STEP 5 Parts Required STEP 6 Parts Required 15 STORAGE PANEL X 2 1 2 3 3 21 18 BOTTOM CROSS MDF X 1 H X 1 G X 2 N X 4 O X 4 P X 2 X 2 18 Be careful not to stand on the storage panels as thi...

Page 13: ...page 13 of 23 2575 LAYLA OTTOMAN BED ASSEMBLY INSTRUCTIONS STEP 7 Parts Required 16 TRIANGLE PLATE X 4 H X 1 F X 16 N X 16 O X 16 H 16 O N F X 4...

Page 14: ...Y INSTRUCTIONS 5 5 19 10 13 8 20 8 11 12 Layout of Metal Frame IMPORTANT Please ensure the frame poles are fitted according to the illustration exactly If assembled without follwing this illustration...

Page 15: ...4 I X 1 L X 8 M X 8 D X 4 K X 4 12 5 ON F H X 2 X 2 10 13 11 19 5 19 8 8 11 10 12 10 LEFT RAIL X 1 11 RIGHT RAIL X 1 12 BACK RAIL X 1 13 CENTRE RAIL X 1 19 FRONT RAIL X 1 I X 1 L X 12 M X 12 C X 12 E...

Page 16: ...STEP 10 Parts Required 10 8 5 8 19 12 5 11 20 BED S CROSS RAIL X 1 H X 1 F X 3 N X 3 O X 3 20 X 3 page 16 of 23 LAYLA OTTOMAN BED ASSEMBLY INSTRUCTIONS 2575...

Page 17: ...D ASSEMBLY INSTRUCTIONS 2575 STEP 11 BOLTS SHOULD BE POSITIONED AT THE CENTRE OF THE LONG HOLES 9 9 Parts Required OR RIGHT SIDE OPENING LEFT SIDE OPENING 9 HINGE LEFT RIGHT X 2 17 HINGE S SUPPORT RAI...

Page 18: ...page 18 of 23 LAYLA OTTOMAN BED ASSEMBLY INSTRUCTIONS 2575 STEP 12 Parts Required People are required to fit the frame safety...

Page 19: ...page 19 of 23 LAYLA OTTOMAN BED ASSEMBLY INSTRUCTIONS 2575 STEP 13 Parts Required Left Side Opening OR Right Side Opening I X 1 L X 12 M X 12 D X 6 J X 1 K X 6...

Page 20: ...STEP 14 Parts Required 4 GAS LIFT X 2 9 HINGE LEFT RIGHT X 2 J X 1 Q X 4 J Q J Q 9 4 9 9 9 4 J Q J Q J Q page 20 of 23 LAYLA OTTOMAN BED ASSEMBLY INSTRUCTIONS 2575 LEFT RIGHT...

Page 21: ...page 21 of 23 LAYLA OTTOMAN BED ASSEMBLY INSTRUCTIONS 2575 STEP 15 Parts Required 14 WOODEN SLAT 4FT6IN X 26 5FT X 28 A 4FT6IN X 26 5FT X 28 B 4FT6IN X 13 5FT X 14...

Page 22: ...me may rise quickly The speed of closing will also depend on the weight of the mattress so always keep fingers well clear of the metal frame PLEASE NOTE It takes a lot of force to make the initial mov...

Page 23: ...that the components are in their proper position free from damage Also make sure the connectors are tight and secure WHEN STORING ITEMS IN THE OTTOMAN ENSURE THAT THE CENTER RAIL SUPPORT LEGS ARE FREE...

Reviews: