background image

18

L

R

Turm to page 18 for fitting the hinges

IMPORTANT PISTON INFORMATION

The pistons used in the construction of this product are extremely strong and cannot be operated by

hand when not fitted to the ottoman hinges. All pistons are tested in the factory for correct pressure

and operation before use.

Initially it might appear that the pistons are very stiff when opening and closing the ottoman frame,

                                                                   THIS IS NORMAL.

After operating the ottoman a few times, the movement of the pistons and the opening and closing of the ottoman
 will become easier.

page 6 of 21

ASHBOURNE SIDE OTTOMAN BED ASSEMBLY INSTRUCTIONS

Version 1 1/1/18

Summary of Contents for Ashbourne Side ottoman bed

Page 1: ...amiliarise yourself with the various stages of construction Carefully open the pack supplied and check the contents against the parts and fittings check list Do not destroy any of the packaging until...

Page 2: ...efore use Check all screws or bolts are tightened and inspect regularly This product should only be used on firm level ground Dismantle for transportation Only use recommended accessories Tools are in...

Page 3: ...duct If any components are missing please contact your retailer The fittings pack contains small items that should be kept away fromsmall children 12 10 8 13 5 5 15 15 3 3 16 16 16 16 18 6 6 7 17 9 9...

Page 4: ...2 PCS Description LEFT RAIL Carton NO 3 1 PC Description RIGHT RAIL Carton NO 3 1 PC Carton NO 3 1 PC Description BACK RAIL Carton NO 2 Description WOODEN SLAT Qty 2PCS Carton NO 1 Description STORAG...

Page 5: ...32 34 34 10 20 30 40 50 60 70 80 90 100 1 1 1 A B Not to scale Fixings to scale Ref Qty Dimensions Anti Skid Nut CAUTION There are many small components used in the construction of this product Pleas...

Page 6: ...nges All pistons are tested in the factory for correct pressure and operation before use Initially it might appear that the pistons are very stiff when opening and closing the ottoman frame THIS IS NO...

Page 7: ...toman is almost shut it will close completely under its own weight When lowering the slat unit for the first time take care to make sure it does not rub unevenly on the inside face of the Side Rail If...

Page 8: ...page 8 of 21 Do not attempt to move the bed whilst the frame is in the upright positon ASHBOURNE SIDE OTTOMAN BED ASSEMBLY INSTRUCTIONS Version 1 1 1 18...

Page 9: ...page 9 of 21 Layout Parts on Soft Surface Lay out all 4 sides on a soft surface i e Rug Carpet or Packaing Carton ASHBOURNE SIDE OTTOMAN BED ASSEMBLY INSTRUCTIONS Version 1 1 1 18...

Page 10: ...arts Required H G NO X 2 1 HEADBOARD X 1 2 FOOTBOARD X 1 7 STORAGE BASE SUPPORT X 2 H X 1 G X 4 N X 4 O X 4 6 LEG X 4 STEP 2 Parts Required 1 2 G NO 7 1 2 6 ASHBOURNE SIDE OTTOMAN BED ASSEMBLY INSTRUC...

Page 11: ...X 8 STEP 4 Parts Required 3 3 2 1 Make sure the bed is square Note THEN tighten all bolts 100 using allen key ASHBOURNE SIDE OTTOMAN BED ASSEMBLY INSTRUCTIONS X 4 1 2 3 3 X 2 18 18 BOTTOM CROSS METAL...

Page 12: ...ed 15 STORAGE PANEL X 2 ASHBOURNE SIDE OTTOMAN BED ASSEMBLY INSTRUCTIONS Be careful not to stand on the storage panels as this could cause damage to the panels 15 15 3 2 3 1 16 TRIANGLE PLATE X 4 H X...

Page 13: ...IMPORTANT Please ensure the frame poles are fitted according to the illustration exactly If assembled without follwing this illustration the frame will not fit to the bed correctly ASHBOURNE SIDE OTT...

Page 14: ...1 F X 6 N X 6 O X 6 12 5 ON F H X 2 10 11 13 5 13 11 10 12 page 14 of 21 10 LEFT RAIL X 1 11 RIGHT RAIL X 1 12 BACK RAIL X 1 13 FRONT RAIL X 1 I X 1 L X 8 M X 8 C X 8 Ensure the frame is square befor...

Page 15: ...X 2 17 HINGE S SUPPORT RAILS X 2 H X 1 G X 8 O X 8 N X 8 BOLTS SHOULD BE POSITIONED AT THE CENTRE OF THE LONG HOLES 9 9 Parts Required LEFT SIDE OPENING OR RIGHT SIDE OPENING ASHBOURNE SIDE OTTOMAN BE...

Page 16: ...page 16 of 21 STEP 10 Parts Required People are required to fit the frame safety ASHBOURNE SIDE OTTOMAN BED ASSEMBLY INSTRUCTIONS Version 1 1 1 18...

Page 17: ...page 17 of 21 STEP 11 Parts Required Left Side Opening OR Right Side Opening I X 1 L X 12 M X 12 D X 6 B X 1 K X 6 ASHBOURNE SIDE OTTOMAN BED ASSEMBLY INSTRUCTIONS Version 1 1 1 18...

Page 18: ...STEP 12 Parts Required 4 GAS LIFT X 2 9 HINGE LEFT RIGHT X 2 B X 1 E X 4 B E B E 9 4 9 9 9 4 B E B E B E page 18 of 21 LEFT RIGHT ASHBOURNE SIDE OTTOMAN BED ASSEMBLY INSTRUCTIONS Version 1 1 1 18...

Page 19: ...STEP 13 Parts Required 14 WOODEN SLAT 3FT X 14 A 3FT X 28 page 19 of 21 ASHBOURNE SIDE OTTOMAN BED ASSEMBLY INSTRUCTIONS Version 1 1 1 18...

Page 20: ...d on the weight of the mattress so always keep fingers well clear of the metal frame PLEASE NOTE It takes a lot of force to make the initial movement of the ottoman THIS IS A DESIGN FEATURE OF THE PRO...

Page 21: ...y assembled Periodically check to ensure that the components are in their proper position free from damage Also make sure the connectors are tight and secure keep instructions for future reference ASH...

Reviews: