6
2
Recommended installation
Your dock leveller can be put into operation quickly and safely when you follow the
recommended procedure below:
• Install the housing
• Check the power supply connection
• Wire the dock leveller to the controller
• Rapid adjustment
The dock leveller can now be operated.
• Install additional components
• Program additional components and functions
3
Installing the housing
The dock leveller controller must be fitted vertically to a plane foundation free of vibrations.
The installation site must be seen clearly from the dock leveller room.
Summary of Contents for LB 700
Page 28: ...28...