GEZE Powerdrive PL Pre-Installation Instructions Download Page 5

Powerdrive product family

5

Fundamental safety notes

2.3  Safety-conscious working

 

à

Secure workplace against unauthorised entry.

 

à

Use only the cables specified on the cable plan provided. Cables must be shielded in compliance with the 

wiring diagram.

 

à

Secure loose, internal drive cables with cable ties.

 

à

Before working on the electrical system:

 

à

Disconnect the drive from the 230 V mains and secure it against being switched back on again. Check isolation 

from power supply.

 

à

Disconnect the control unit from the 24 V rechargeable battery.

 

à

Note that if an Uninterruptible Power Supply (UPS) is used, the system will still be supplied with voltage  

despite the fact that the power supply is disconnected.

 

à

Always use insulated wire-end ferrules for wire cores.

 

à

Make sure of sufficient lighting.

 

à

Risk of injury with opened drive. Hair, clothing, cables, etc. can be drawn in by rotating parts.

 

à

Risk of injury caused by unsecured crushing, impact, drawing-in or shearing spots.

 

à

Risk of injury due to sharp edges on the drive and door leaf.

 

à

Risk of injury during installation through freely moving parts.

2.4  Environmentally conscious working

 

à

When disposing of the door system, separate the different materials and have them recycled.

 

à

Do not dispose of batteries and rechargeable batteries with household waste.

 

à

Comply with the statutory regulations when disposing of the door system and the batteries/rechargeable 

batteries.

2.5  Safety note related to transportation and storage

 

X

Do not throw, do not drop.

 

X

Avoid heavy impacts.

 

à

Storage temperatures under –30 °C and above +60 °C can result in damage to the device.

 

à

Protect against humidity.

 

à

Dry, well ventilated, closed, weather-proof and UV-protected rooms are suitable as storage areas.

2.6  Qualification

Observe country-specific regulations!

Applicable in Germany: 

Companies that carry out the pre-assembly of sliding door drives for escape routes must be licensed as an  

expanded manufacturing facility by the testing institution that issued the type approval certificate.

Summary of Contents for Powerdrive PL

Page 1: ...Powerdrive Product family EN Pre installation instructions 192474 01...

Page 2: ...ps 7 4 5 VP Kit bill of material 7 5 Pre mounting 8 5 1 Machining the track and cover 8 5 2 Preparing the track 8 5 3 Installing stop buffers 9 5 4 Connecting the contact on the toothed belt locking o...

Page 3: ...itional Information X X Symbol for an action This means you have to do something X X If there are several actions to be taken keep to the given order 1 2 Revisions and validity Version 01 valid for Po...

Page 4: ...and repair work must be performed by properly trained personnel authorised by GEZE The country specific laws and regulations are to be observed during safety technology tests If unauthorised changes...

Page 5: ...unsecured crushing impact drawing in or shearing spots Risk of injury due to sharp edges on the drive and door leaf Risk of injury during installation through freely moving parts 2 4 Environmentally...

Page 6: ...er bespoke 150 105 90 70499 2 0247 Component drawing Track perforated 70485 2 0200 Component drawing Track bespoke PL 2 leaf 70485 2 0251 Component drawing Track bespoke PL 1 leaf The diagrams are sub...

Page 7: ...lide to open 1 leaf left hand slide to open 4 5 VP Kit bill of material 1 Cover fixing 2 Transformer ground 3 Transformer 4 Transformer cable 5 Deflection pulley 6 Cable guide 7 Track 8 Control unit 9...

Page 8: ...k profiles for damage X X Cut the track and cover to the required length see machining drawings Chapter 4 1 X X Check whether additional bore holes are necessary see machining drawing for bespoke trac...

Page 9: ...f installation 5 4 Connecting the contact on the toothed belt locking optional X X Remove the screws 2 on the feedback switch 1 of the tooth belt locking mechanism X X Place the alarm contact switch 3...

Page 10: ...ction pulley measured from the middle U2 Position of the motor gear unit UR Position of the deflection pulley measured from the side Vrs Extension left Vls Extension right When the drive is extended V...

Page 11: ...ormer and control unit X X Make sure that cables are cut to length and routed in such a way that they do not become jammed when the cover is positioned and cannot come into contact with moving compone...

Page 12: ...ide DCU 4 to the control unit X X Guide the transformer cable 1 between the control unit 2 and track 5 Alternatively the transformer cable 1 can also be mounted on the front of the control unit X X Fi...

Page 13: ...into the control unit 4 2 3 4 Powerdrive PL FR X X Route the rotary encoder cable 2 motor connection cable 3 and motor connection cable of the second motor gear unit 1 to control unit X X Insert the...

Page 14: ...tooth belt locking mechanism 1 in at the control unit 2 1 2 X X Lay the cable for tooth belt locking mechanism 1 through the cable guide to the tooth belt locking mechanism optional 3 shorten if nece...

Page 15: ...trate the anodised layer of the track 5 11 Fitting the cover earthing X X Screw the cable shoe of the cover earthing cable 6 using a countersunk screw 3 serrated washer 4 and hexagon nut 5 to the cove...

Page 16: ...8 x 13 countersunk tapping screws 3 X X Screw the threaded pins 5 completely into the retaining blocks 4 from below 2 5 4 X X Glue the side cover panels 7 to the side plates 2 on the outside with 4 g...

Page 17: ...1 is plugged in the pulley on the motor gear unit may move suddenly X X Do not reach into the area of moving parts X X Check whether the rechargeable battery cable 1 is long enough X X If necessary pl...

Page 18: ...etween the PE line of the mains cable and the metal part contacted with the probe is tested in each case Use the probe to contact at least the following test points Transformer metal bracket PE connec...

Page 19: ...Powerdrive product family 19 Device safety test and production test...

Page 20: ...geze com www geze fr Hungary GEZE Hungary Kft E Mail office hungary geze com www geze hu Iberia GEZE Iberia S R L E Mail info es geze com www geze es India GEZE India Private Ltd E Mail office india...

Reviews: