1
1. GENERAL
1.1
NOTICE OF INSTALLATION
To make sure a safe and correct operation, please check conditions below
before install the machine:
1) Power source capacity must be equal of the machine need.
2) Machine standard power is AC110v/230v (+- 10%)
3) Machine standard power Hertz is 50/60 Hz. (+- 2%)
4) Machine is workable under the temperature between 0
℃
- 45
℃
5) Make sure the wire is tidy on the ground.
6) There should not have vibration beside the machine during the
installation, and make sure to ground is flat.
7) Read and follow the instruction of the installation.
Summary of Contents for GPPW-1500B