Operation
For safe and efficient use of the Laminar Flow Glovebox /Isolator, you should take into
account the equipment and materials necessary for the proposed operation and list the
procedural details for each operation. The best way to accomplish this is through the use of
a checklist and/or protocol that includes all equipment, apparatus, tools, products and
supplies necessary for each specific procedure. The list should include the order of events in
enough detail to successfully carry out the proposed operation. This list needs to be
exhaustive, including such items as initial cleaning equipment, spill control equipment and
even extra gloves in case a change is required in the middle of the operation.
It is recommended to perform several trial runs in the Laminar Flow Glovebox /Isolator before initiating
preparation.
1. Inspect Gloves and Sleeves. Please refer to Appendix on this topic. If appropriate, change
gloves to the preferred type and size.
2. Clean the inside of the airlock. Please refer to the Appendix on this topic.
3. Ensure both airlock doors are latched.
4. Place Sharps collectors as instructed in the section on this topic.
5. Attach waste collectors to the discharge tube utilizing either the provided clamp or alternate
method (tape or elastic for example).
6. Clean the inside of the work area rigorously. Please refer to Appendix on this topic.
7. Ensure the stoppers for the trash tubes and sharps are seated in place
8. Turn on the work area light and watch for its operation.
9. Turn on the main blower switch. The low pressure alarm will sound until adequate pressure
is achieved. Gloves should move into the work area if the unit is under negative pressure
and out of the work area if under positive pressure.
10. Push the Airlock Purge button and ensure the accompanying red light illuminates.
11.
Allow 10 minutes to pass to ensure all air inside of the work area has been filtered
numerous times and an ISO Class 5 condition is met
.
12. Adjust the height of the stand to a comfortable working height.
13. Wipe down and place compounding elements into the airlock.
14. Push the airlock purge button, red light will illuminate.
15. Do not open the inner airlock door until light is off.
22
Summary of Contents for LFGI-3USP
Page 1: ...Laminar Flow LFGI CAI or CACI User Manual ...
Page 33: ...33 ...
Page 51: ...SECTION IV UNIT DIAGRAM Made in the USA and available for purchase on the GSA 51 ...
Page 55: ...55 ...
Page 59: ...59 ...
Page 63: ...Fig 2 Air recycle plenum connection tip removed 63 ...
Page 85: ... 863 248 2800 www sensocon com 20 Installation and Operation Manual Series A3 A4 ...