Geovent COMPACT arm Instruction Manual Download Page 4

Instruction Manual COMPACT Arm 

 

 

5.  Subsequently, the hose is mounted on the 

ceiling bracket. The rubber band is taken out 
over the ceiling bracket, after which the hose 
is fixed by means of a clamp. Bending the 
edge of the hose is the best way of doing 
this, so that the steel spiral is pulled/twisted 
up on the bracket. When the hose has been 
properly fixed, the rubber band is finally 
pulled over the clamp. 

 
6.  The hose is mounted on the funnel by 

tightening the clamp around the funnel and 
the hose. (NB. Remember first to pull the 
rubber band over the funnel). When the hose 
has been fixed properly, the rubber band is 
pulled over the clamp. Subsequently, the 
Arm is connected to the complete piping 
system. 

 
7. 

If the telescopic function cannot remain in the 
required position or if there is too much 
resistance in the Arm, please adjust the 
balancer at the back of the ceiling bracket. 

 
2.1 Mounting of optional equipment 

 
Mounting of the extension arm 
Start by fixing the extension arm to a solid wall, 
e.g. a concrete wall (applies to 1.0, 2.5 and 4.0 
m).  (Please  refer  to  the  whole  dimensions).                     

     

 

 
 

At 4 meters, every joint is assembled and then the 
Arm is mounted. Next, the spiro pipe is fastened 
to the extension arm by means of the enclosed 
self-cutting screws. The part between the spiro 

pipes is assembled by means of clamps and the 
supplied hose. Subsequently, the Arm is attached 
to the extension arm. 

 

Mounting of the damper 
Is factory-mounted. Contact your dealer. 
 
Mounting of light  
The mounting of light and net should have been 
taken care of by the factory. Extending the power 
cord, which is attached inside the Arm, where it is 
to be fixed, makes the connection. Next, the 
power cord is connected to the transformer (24V 

Æ

 220V), which again is connected to the mains. 

 

Light specifications: 

Type: Halogen 
Power: 

50 W  60° 

Voltage: 12 

Recommended Trafo-power: 

70 W 

 

2.2 Power connection 

 
For connection of various electrical components 
(e.g. light sensor), please refer to the enclosed 
documentation for the actual product. 
The electrical installation is to be carried out by a 
certified electrician.  
 

2.3 Trial run – exact adjustment 

 
After the final mounting, the COMPACT Arm 
should be adjusted to the typical working area, for 
optimum utilisation of the Arm. Do so by adjusting 
the points mentioned in item 2 (3. 4. and 7.) 
exactly.  
 

3.0 User instruction – application

 

 
For normal use, the Arm is to be self-retaining in 
the required position within the working area. The 
bracket of the Arm supplies a 360° rotary working 
area.  
If the equipment has been correctly dimensioned, 
the funnel of the Arm should be placed in vertical 
position 300-500 mm over the blanks to be 
welded. That is just above the pollutant. Thus up 
to 99% of the polluting particles will be caught. 

 

Less optimal welding situation. 

2.5 & 4 m Extension arm 

1 m Extension arm 

Reviews: